Indian Geotechnical Services is involved in different projects across India, ranging from small building projects to medium-scale industrial projects to significant projects including hydropower projects, highway projects, railway projects, dedicated freight corridor project, metro projects, irrigation & Water Supply projects and Airport projects.
In this section we provide a sample of some of our assignments, illustrating the range of markets and capabilities IGS serves in India & abroad.
Our commitment to the projects has earned us recognition from many of our clients.

Airports
Indian Geotechnical Services have rendered Geotechnical Services at various major domestic and International airports in India and Abroad. Few airport projects completed in India and abroad are as below:
- Detailed Geotechnical Investigation for Delhi International Airport , New Delhi
- Detailed Geotechnical Investigation for Kabul International Airport, Kabul
- Geotechnical Investigation for Upgradation of Safai Airport at Itawaha, Uttarpradesh
- Geotechnical Investigation for New Integrated Terminal Complex at Chandigarh Airport
- Geotechnical Investigation for Shimla Airport , Himachal Pradesh
- Geotechnical Investigation for Karad Airport, Maharastra
- Geotechnical Investigation for New Airport at Azamgarh, Uttarpradesh
- Geotechnical Investigation for New Airport at Chitrakoot, Uttarpradesh
- Geotechnical Investigation for Airport Terminal Building at Khajuraho (MP)

Highways
IGS is working extensively on improving India’s highway infrastructure, focussing on assignments for respected clients, particularly the National Highway Authority of India (NHAI). Activities in this sector include Geotechnical Investigation for bridges, flyovers and road over bridges, material and pavement investigations, recommendation for shallow and deep foundations, design of embankments and slope stability analysis for urban, inter-urban and industrial estate road systems.
IGS is empanelled as consultants for Geotechnical investigation for Highways, bridges and Tunnel projects on National Highways and other centrally sponsored schemes in Category – IV with Ministry of road transport and highways.
Few projects completed by IGS for:
Important River Bridges:
- Soil Investigation for Delhi-Noida Bridge (Toll Bridge) over River Yamuna connecting Delhi & Noida.
- Soil Investigation for Cable Stayed Bridge across Yamuna at Naini, Allahabad
- Geotechnical Investigation for Cable stayed bridge over River Yamuna (Signature Bridge) downstream of existing bridge at Wazirabad, Delhi
- Soil Investigation for Yamuna Bridge in Agra.
- Geotechnical Investigation for major bridge across river Ganges (Mahatma Gandhi Setu) connecting Bakhtiyarpur to Shahpur Pataori in Bihar
- Geotechnical Investigation for Major Bridge over River Sone and Ganga on Patna Baxer Section of NH – 30 in Bihar
- Geotechnical Investigation for Bridges over River Sutlej and Beas in Punjab
- Geotechnical Investigation on land along the alignment of the proposed ‘Chambal Bridge’ Kota, Rajasthan
Other Highway projects:
- Geotechnical Investigation work for Construction of flyover at Hero Honda Chowk on NH-8 at Km 36+200 on Delhi-Gurgaon Expressway.
- Geotechnical Investigation for proposed structure location of Milak Bypass of Moradabad Bareilly Section of NH – 24 in the state of UP
- Geotechnical Investigation work for NH-6 near Fulgaon Village, Jalgaon on deposit work for MSPGCL.
- Geotechnical Investigation & Testing of Sil & Rock Samples at Z Morh Tunnel Project in Jammu & Kashmir.
- Geotechnical Investigation & testing of soil & rock samples at proposed structure location of Khed-Sinnar Section of NH-50 in Maharashtra
- Geotechnical Investigation work for flyovers/rail over Bridge (ROB) at Dehradun, Uttarakhand
- Geotechnical Investigation for Ring Road / Bypass around Srinagar City in J&K
- Geotechnical Investigation work for 4-laning of Kashipur to Sitarganj Section of NH-74, UK
- Geotechnical Investigation of One ROB/Bridge and Three Flyover at Itanagar, Arunachal Pradesh.
- Geotechnical Investigation of Kiratpur Ner Chawk (Himachal Pradesh)
- Geotechnical Investigation of Bikaner - Suratgarh Section of NH-15 in the state of Rajasthan
- Geotechnical Investigation of Six No. of Bypasses on Gurgaon-Kotputli-Jaipur section NH-8 in the state of Haryana and Rajasthan
- Geotechnical Investigation for preparation of DPR for rehabilitation and upgrading to 2-lane with pave shoulders configuration of NH-71, from Jind – Jalandhar in the Station of Haryana & Punjab – Addendum-III
- Geotechnical Investigation of Raebareli-Jaunpur section of NH-231 in the state of Uttar Pradesh
- Geotechnical Investigation of Aurangabad to Barwa Adda section on NH-2 From Km. 249.770 to 276.000 And Km. 276.000 to 320.800 in the state of Westbengal
- Geotechnical Investigation for four laning of Lucknow – Raebareli section from Km. 12+700 to Km. 82+700 of NH – 24B in the state of Uttar Pradesh under NHDP Phase IV A on DBFOT (Annuity) Basis
- Geotechnical Investigation of 4/6-Laning of Raipur-Bilaspur Section of NH-200 from Km. 0.00 to Km. 127+650 in the state of Chattisgarh under NHDP Phase – IV on DBFOT basis.
- Geotechnical Investigation of Six Laning of Jaipur Ring Road from Ajmer Road to Agra Road section at Jaipur in the state of Rajasthan on DBFOT (Toll) basis (approx 47 Km length.
- Geotechnical Investigation for widening and strengthening of the existing 2-lane road to a 4-lane divided carriageway from Km 256+550 (Kota) to Km 289+560 (Darah) and 2-lane Paved Shoulder from Km 289+560 (Darah) to Km 346+539 (Teendhar) Section of NH-12 on BOT Tool under NHDP Phase – III in the State of Rajasthan.
- Geotechnical Investigation of Six Laning of Etawah-Chakeri Section of NH-2 in the state of Uttar Pradesh
- Geotechnical Investigation of for Preparation of DPR for Bridges in Saharsa District in the state of Bihar
- Geotechnical Investigation for structure of Beawar – Gomti Section of NH – 8 in the state of Rajasthan.
- Geotechnical Investigation of for development of Seoni-Katangi Road (SH-54) in the state of Madhya Pradesh on BOT Basis (Length of Project Road – 75 Km).
- Geotechnical Investigation of for Preparation of DPR for 3 Major Bridges in Silvassa, Dadra & Nagar Haveli.
- Geotechnical Investigation for Preparation of DPR for 4 Major Bridges in Daman.
- Geotechnical Investigation for the proposed 4.8 km long tunnel on SPUR alignment of Mumbai – Vadodara Expressway
- Pavement Investigation and Materials Survey for Consultancy Services for Preparation of Detailed Project Report for BRTS Corridor (Mukundpur to Kondli) in Delhi.
- Geotechnical Investigation for Bridges on Damoh - Hirapur Section in the state of Madhya Pradesh
- Geotechnical Investigation Hazaribagh – Ranchi Section of NH-33 from Km. 40.500 to Km. 114.00 in the state of Jharkhand under NHDP Phase III on BOT (Annuity) Basis.
- Geotechnical Investigation for the Preliminary Design for Development of Road Corridors and city bypass in Jamshedpur, Jharkhand through Public Private Partnership (PPP).
- Geotechnical Investigation & Testing of Soil Samples at two toll plaza locations of Moradabad – Bareilly section of NH-24 in the state of Uttar Pradesh.
- Geotechnical Investigation & Testing of Soil and Rock Samples for Major Bridge Km. 85.810 (Damodar River Bridge) of Hazaribagh-Ranchi section of NH-33 in the state of Jharkhand.
- Geotechnical Investigation for Agra-Aligarh Road Project (from Chainage 0.000 Km to CH. 79.00Km Section NH-93)
- Geotechnical Investigation for Jaipur Ring Road from Ajmer Road to Agra Road Section at Jaipur in the state of Rajasthan on DBFOT (Toll) Basis Project
- Geotechnical Investigation for up-gradation to Two lane with paved configuration of Chapra –Gopalganj section of NH-85 in the state of Bihar
- Geotechnical Investigation for consultancy services for detailed engineering for Four lanning of Patna – Bakhtiyarpur section of NH-30 from Km. 181.300 to Km. 231.950 in the state of Bihar under NHDP III on DBFOT Toll basis.
- Material Investigation for Barwa Adda-Panagarh Section of NH-2
- Geotechnical Investigation for Four Laning of Meerut Bulandshahr Section of NH-235 from Km. 7.469 to Km. 66.482 in the state of Uttar Pradesh
- Geotechnical Investigation for Development and Peration & Maintenace of “Ropar – Chamkaur Sahib – Neelon Doraha (up to NH-1) Road” on Design, Build, Finance, Operate & Transfer (DBFOT) basis in the state of Punjab.
- Geotechnical Investigation for Six laning of Gurgaon-Katputly-Jaipur section NH-8 in state of Rajasthan.
- Geotechnical Investigation for Design and Engineering Consultancy Services for Four laning of Delhi – Sharanpur – Yamunotri Road up to Uttarakhand Border from km. 10.911 to km. 217.000 in the state of Uttar Pradesh (SH-57) on Design, Build, Finance, Operate and Transfer (DBFOT) basis – Design Consultancy for Package IIIA , Package IIIB, Package I-F, Package I-E, Package I-D
- Geotechnical Investigation for preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lanes / 2 lane with Paved Shoulders configuration of Narkanda – Wangtoo section (km. 224 to 335) of NH-22 in the state of Himachal Pradesh
- Geotechnical Investigation for preparation of feasibility cum preliminary study for Udaipur Bypass, Between NH-76 & NH-8 in State of Rajasthan
- Geotechnical Investigation for Preparation of DPR for Rehabilitation and Upgrading to 2-Lane of NH-87 Ext. Km. 0/0 to 109/0, from Jeolikot-Ghigarikhal.
- Determination of Compaction of compacted earth embankment layers by standard tests on Yamuna Expressway Between Km. 57.00 to Km. 165.00
- Sub Soil Investigation for the Project “ Consultant for Determining the suitability and feasibility of PPP Transaction and to implement agreed transactions between Uttar Pradesh State Highways Authority and the Concessionaire for State Highways in Uttar Pradesh:- Delhi – UP Boreder at Loni to UP-Uttarakhand Border of SH-57 Length=206.089”
- Geotechnical Investigation & Testing of Soil Sample and Rock Samples of existing road section from Moradabad to Bareilly of NH-24 (Betwwn existing Km. 148.00 to 262.00) in the state of Uttar Pradesh.
- Geotechnical Investigation for Six Lanning of Indore Dewas section of NH-3 from Km. 577.550 to Km. 610.000 and from Km. 0.000 to Km. 12.600 of National Highway No. 3 in the State of Madhya Pradesh.
- Geotechnical Investigation for preparation of feasibility cum preliminary design for construction of stand alone ring road / bypass in Indore City in the state of Madhya Prasesh under NHDP Phase-VII.
- Geotechnical Investigation work for the Design of Road from Balasore to Kharagpur on NH-60 in the state of West Bengal (Phase-II)
- Geotechnical Investigation work for the Design of Bridges / Flyovers in Amravati to Gujarat / Maharashtra Border from km. 550 to km. 649 on NH-6 in the State of Maharashtra (Package-I to VI)
- Geotechnical Investigation work for preparation of detailed design / Drawing for JAHU Bridge in the state of Himachal Pradesh.
- Geotechnical Investigation work for Design of Bridges / Flyovers, in Patiala-Bathinda from km 62.50 to 209.50 on NH-64 in the State of Punjab.
- Geotechnical Investigation work for the Design of road from Blasore to Kharagpur on NH-60 in the state of West Bengal (Phase-I)
- Geotechnical Investigation for Preparation of DPR for rehabilitation and upgrading to 2-laning with paved shoulders configuration of NH-71, from Jind-Jalandhar in the State of Haryana & Punjab.
- Material Investigation for Yamunanagar – Panchkula Project.
- Rock Testing for Vadakanchery – Thrissur Section of NH-47
- Geotechnical Investigation work & Testing of Soil and Rock Sample for Preparation of DPR of Godhra-Gujrat / MP Border Section of NH-59
- Soil Testing for Bagodara-Watanam-Tarapur-Vasad Section of NH-8, (Project Code THDBSC901)
- Geotechnical Investigation for Feasibility and Preparation of DPR for up-gradation of Ashram-Badarpur section of NH-02 (Km. 8.30 to km 16.100) including improvement of Intersection at Ashram (Mathura Road)
- Geotechnical Investigation for Preparation of DPT for Rehabilitation and Up-gradation of NH stretches under NHDP-IVB-Gourp B: Package 7 in the state of Maharashtra (Solapur-Yedishi section of NH-211 and Dhule – Aurangabad section of NH-211)
- Geotechnical Investigation for preparation of DPR for GAD Square Flyover in Bhopal City.
- Geotechnical Investigation for Bridge No. 139 & in between chainage Km 147/100-Km 147/500 on Dharma-Quazigund Section in J & K.
- Geotechnical Investigation for detailed design of tow flyovers at km 52+530, km 56+170 & additional viaducts on Kalka side of ROB at Km 41+001 on Himalayan Expressway.
- Six Laning of Indore-Dewas Section of NH-3 from km 577.550 to km 610.00 and from km 0.00 to 12.600 in the state of Madhya Pradesh (Length 45 Km)
- Geotechnical Investigation work for Construction of 4 lane flyover at Jamalpur Chowk on Ludhiana-Chandigar Road at Ludhiana.
- Geotechnical Investigation work for Design, Engineering, Finance, Construction, Operation and Maintenance of “Two Laning of Muzaffarpur-Sonbarsa Section of NH-77 (from km 2.8 to km. 89.00) in the state of Bihar Under NHDP III on DBFOT Annuity basis”
- Geotechnical Investigation work for Detailed Design and Drawings for Four Laning of Barhi-Hasaribagh section of NH-33 from Km.0.00 to Km. 41.313 in the state of Jharkhand.
- GI for Bridges/Structures and Material Investigations for Detailed Project Report for Rehabilitation and upgrading to 2-lane with paved shoulders configuration of Narsinghpur – Harrai – Amarwara section of SH 47 in the state of Madhya Pradesh (Length 90 km.)
- Sub-soil investigation for proposed interchange at Amramarg with NH- 4 B near Gavhan Phata in Mimbai, Mharashtra state.
- Material investigation for Muzaffarnagar – Hridwar Project (Project code THDDMH903)
- Soil Testing for Rothak Panipat Highway Project (Code-THDDPR)
- Geotechnical Investigation for the proposed 290 m long Sirohi Bypass tunnel along NH – 14 in the state of Rajasthan
- Geotechnical Investigation for Bridges and ROBs at Raebareilly-Allahabad Section of NH-24 B and Kanpur-Kabrai Section of NH-86.
- Geotechnical Investigation for Improvement / upgradation of Jahanbad-Ghosi-Islampur-Rajgir-Giriyak-Parwatipur Road (85 Kms) of Bhihar State Highways Project (SH-71)
- Geotechnical Investigation Work For the Design of Bridges / Flyover, in AGRA – Itawah – NH – 2 (UP)
- Geotechnical Investigation Services for Bridges at UNA BARSAR Road Project
- Geotechnical Investigation Improvement / up gradation of Hajpur - Lalganj - Vaishali-Manikpur - Deoria, Sahebganj – Kesharia – Khjuria - Areraj Road (SH-74).
- Geotechnical Investigation Improvement & Up gradation of Kursela – Forbesgang Road BIHAR.
- Consultancy Services for Preparation of Feasibility-cum-preliminary of major bridge across river Gangas at Bakhtyarpur to Shahpur, Patsori BIHAR.
- Design & construction of formation including blanketing, major bridge, minor bridges RUBs, ROBs supply & spreading of Ballast and other work at state of BIHAR & UP in India.
- Sub-Soil investigations (Bridges / Structures / along road) for preparation of Detailed Feasibility Study and preparation of Bid Documents for proposed Ganga Express Driveway along the Southern Bank of river Ganga at Patna.
- Geotechnical Investigation for Bridges, ROB etc for Munger Bhagalpur Section of NH – 80
- Geotechnical Investigation for minor bridges / retaining walls for Hodel-Nahu Tabdu-Vilaspur - Section.
- Geotechnical Investigation for Flyover at Bhogpur Panjab.
- Geotechnical Investigation and Sub-Soil Exploration for Bridges and other structures and Embankments along proposed Ganga Expressway Project.
- Geotechnical Investigation for 150 mm dia confirmatory borehole for Bhutahi Balam Bridge site C-11/BR – 06 Project at Bihar.
- Geotechnical investigation & Testing of Soil and Rock Sample for Preparation of detailed Design and Detailed Project Report of Various projects for REL PUNJAB Expressway Greenfield Project.
- Geotechnical Investigation Work for the Design of Bridges/Flyover for Mohali Phagwara Exp-way.
- Geotechnical Investigation on NH-21 (Km. 28.60 to 73.20) Under NHDP in Punjab on BOT Basis Phase –IIIA for Pkg. No. NHDP-III/BOT/IV/03
- Geotechnical Investigation for 4/6 lae Kundli – Manesar – Palwal Expressway in Haryana on BOT basis
- GI for finding out the safe Bearing Capacity of the strata at the founding level of Bridges of NH-26
- Geotechnical Investigation for widening of UP link road from 6 lane to 8 lane and making signal free junctions by providing clover leaves.
- Geotechnical Investigation for Jaipur Ring Road Development Corridor in Rajasthan.
- Geotechnical Investigation for Bridges of Road Subprojects in Jammu & Kashmir-DSC-IV (Kashmir Transport Project C-703)
- Geotechnical Investigation for preparation of DPR of various project for Chhattisgarh Accelerated Road Development Programme (CARDP), Phase I in Chhattisgarh.
- Geotechnical Investigation work for Bridge and elevated structures, for six-laning of NH-4 & 46 from Krishnagiry-Walahjpet in the state of Tamilnadu Undr NHDP (Phase-V (Lot-2) (Length 143 km)
- Preparation of DPR for Kurali – Kiratpur Section of NH-21 Under NHDP Phase-IIIA on BOT Basis
- Geotechnical Investigation & Rock Drilling for 4/6 lane Kundli – Manesar – Palwal Expressway in the state of Haryana on BOT basis
- Soil Exploration Investigation – for preparation of Feasibility for 6 laning of Gurgaon – Jaipur of NH8 Phase – V
- Geotechnical Investigation for preparation of DPR for Lakhnadon (Km 547/450)-Seoni (Km 596/150) Section on NH-7 in the State of MP under BOT (Annuity) Scheme.
- Geotechnical Investigation for Major / Minor Bridges for 4 Laning of NH 86 Ext from Sehore to Dewas Section in the state of Madhya Pradesh
- Geotechnical Investigation for Proposed Flyovers, Bridges & Other minor structure site for KMP Expressways Ltd. From Km. 66 to 135.600.
- Preparation of DPR for the Construction, Up-gradation, Operation and Maintenance of Patiala-Nabha-Malerkotla project road in Punjab,
- Pilling work for construction of various structure at package CII-BR-9 of East West corridor, part of NH-57 near Muzaffarpur.
CII-BR-8 of East West corridor, part of NH-57
CII-BR-6 of East West corridor, part of NH-57 - Soil Exploration investigation – consultancy services for preparation of Feasibility for 6 lanning of Gurgaon – Jaipur of NH-8
- Geotechnical Investigation for Package AP-8 Kadtal to Armur Section of NH-7 in Andhra Pradesh
- Geotechnical Investigation on NH-21 under NHDP in Punjab on BOT basis Phase – IIA for Pkg. No. NHDP-III/BOT/IV/03.
- Geotechnical investigation for Tunnel on NH-54 in Harangajao-Maibong in the state of Assam.
- Geotechnical Investigation for Jammu – Pathankot Section of NH-1A at 3 Bridge.
- Preparation of DPR and good for construction and as built drawings as well as support during construction for the Rehabilitation and strengthening of Existing 2-Lane Road and Widening to 4 Lane Dual Carriageway Configuration of Raipur – Aurang Road on National Highway No.- 6 in the State of Chhattisgarh, (India)
- Geotechnical Investigation for Jaipur-Kishangarh Expressway (NH-8) Package II.
- Geotechnical Investigation for existing 2-lane road for 4-lane dual carriageway of NH-1 (Jalandhar-Amritsar section) PunjabBOT basis.
- Geotechnical Investigation for ROB’s along Kishangarh – Hanumangarh Section of SH-7.
- Geotechnical Investigation for ROB’s in different cities of Punjab.
- Geotechnical Investigation for Major & Minor Bridge site from Muzaffarpur to Darbhanga of NH-57 (Bihar)
- Geotechnical Investigation for the proposed Bridges and Overpasses of Nagpur section of NH-7 Package No. C11/C-6)
- Geotechnical Investigation for Jalandhar-Pathankot Section of NH-1A (Km. 26.00 to 110.00).
- Sub-Soil Investigation for Flyover at Chiravantand at Patna, Capital of Bihar.
- Sub-Soil Investigation work for Proposed Flyovers/Bridges/ROB’s etc, for Ranchi Outer Ring Road
- Sub-Soil Investigation for road and Bridge work Jammu – Pathankot Highway
- Soil Investigation at Bridge location between Jammu – Udhampur Section
- Soil Tests for NH-26 (Rajmarg Chauraha – Lakhanadon Project )
- Geotechnical Investigation for the proposed bridges on NH-24 (Hapur to Moradabad)
- Geotechnical Investigation for Nagpur Dhule Section of NH 6 (Km. 9.20 to 100.00)
- Geotechnical Investigation for Upgradation of Ahmdabad – Mumbai Section of NH-8
- Geotechnical Investigation for 4 laning of Simrahi – Jhanjharpur of NH – 57
- Geotechnical Investigation for Rehabilitation and Upgrading to 4-lane Divided Carriageway Configuration of Six Section of National Highway Stretches in Bihar (Gopalganj – Chhapra – Hajipur) on NH – 85, NH-19
- Geotechnical Investigation for NH-8 “Delhi –Gurgaon Expressway”
- Material Investigation for Mohammadpur – Lakhnadon Section of NH-26 (Km. 351 to Km. 405.77)
- Piling work for Construction of Bir Tekendrajeet Flyover Near Maharani Bridges at IMPHAL
- Geotechnical Investigation for Detailed Feasibility & Engineering Report for (i) Baran – Mangrol-Sawai Madhopur – Bharoty-Gangapur-Bayanna-Bhartpur in Rajsthan & (ii) flyovers / elevated highway between Khasa Kothi and Govt. Hostel Intersections.
- Geotechnical Investigation for Four-Laning Project of NH1-A From Udhampur to Banihal (Km. 66-188) in J&K
- Preparation of Feasibility and DPR of 4 laning and strengthening of NH57 from Km. 70.00 to 0.00 for Darbhanga – Muzaffarpur in Bihar
- Geotechnical Investigation for up-gradation of Panipat to Panchi Gujran Haryana Under North-South corridors Project Km 66.00 to 86.00on NH-1
- Rehabilitation and upgrading of existing road to 4-lane divided carriageway configuration of Patna Busar Stretch on NH-30 & NH-84 in the state of Bihar Under NHDP Phase-III (10000 km) programme – Feasibility study preparation of detailed project report.
- Geotechnical Investigation for 4 laning of Lalitpur-Sagar Section of NH-26
- Geotechnical Investigation for DPR for four / six laning from Amritsar to Pathankot of NH-15 (Punjab)
- Geotechnical Investigation for four / six laning from Amritsar to Pathankot on NH-15 in Punjab
- Sub-soil Investigation for Bridges / ROBs for Development of NH-57, Section Darbhanga – Jhanjharpur in Bihar
- Preparation of DPR for 450 km of selected SH in MP

Railways
- Geotechnical Investigation for North Portal of Pir Panjal Tunnel of T-80 Package-T80 Zone -V on DQ Section of JKRLP, Banihal J&K
- Determination of Bearing Capacity by Conducting Plate load tests at Bridge location of Br. No. 150B, 153, 157C, 160, 160A in zone VI of USBRL New Rail Line Project.
- Geotechnical Investigation for Techno-Economic Feasibilty Study for Light Rail Transit System (LRT) Project
- Geotechnical Investigation for Bogibeel Rail – Cum – Road Bridge on river Bramputra at Dibrugarh, NF Railway.
- Geotechnical Investigation for Bridge Between Km. 126 to 142 and 163 to 168 of Katra – Qazigund Rail Link Project (J&K)
- Geotechnical Investigation for Bridges and Tunnel between 91 to Km. 102 of Katra – Quazigund Rail Like Project, at J & K
- Geotechnical Investigation for Bridges and Tunnel between 75 to Km. 91 of Katra – Quazigund Rail Like Project, at J & K
- Geotechnical Investigation work for Rapid Rail Transit System for Delhi-Ghaziabad-Meerut Corridor
- Soil Investigation in 132 KV transmission line from Block Hut Z to Panki / TSS and Panki / TSS to Sarsaul (Krishna Nagar) over Allahabad Division of Northen Railway
- Special Geotechnical Investigation for carrying out Insitu tests such as Footing Load Test, Insitu Shear Test (CBT) required for the Design of Major Bridges between km 50 -75 of Katra – Laole section of USBRL Project of Northern Railway.
Dedicated Freight Corridor Projects:
- Geotechnical Investigation for Minor bridges Type – 1 & 2 for WDFCC PKG – 1&2, Section 1 & 2 (Approx. 450 Kms) in the state of Haryana, Rajasthan and Gujarat
- Geotechnical Investigation for Western DFCC Project, Pakage 12 & 13 (Vadodara-Vaitarana)
- Geotechnical Investigation for Design and Construction of Civil, structures and Track Works for Double Line Railway involving formation, track works, bridges, structures, buildings including testing and commissioning on Design-Build lump sum basis for Bhaupur – Khurja section (300 Kms) of Eastern Dedicated Freight Corridor in the state of Uttar Pradesh
- Geotechnical Investigation work for Station Buildings & Allied Structure for WDFCC PKG-1&2,Section-1
- Geotechnical Investigation for Design & Construction of Formation including blanketing, Major bridges, Minor bridges, RUBs, ROBs, Supply & Spreading of Ballast and other related infrastructure works for Dedicated Freight Corridor from Ch. 14.108 to Ch 119.437 Km. on Mughalsarai – Sonenagar section of Eaqstern Corridor in the state of Bihar & U.P in India
- Geotechnical Investigation work for DFCCIL Project new Karwandiya to Ganj Kwaja on Mohalsari-Sonenager Section of Eastern Corridor, Bihar & UP

Metros
Indian Geotechnical Services has been involved in Geotechnical Investigation and foundation design for Delhi Metro since its inception. IGS has sucessfuly completed the Investigation for different metro corridor of Phase – I , II & III.
Delhi Metro Phase - III:
- Geotechnical Investigation work for Design & Construction of Shiv Vihar Stations Including Architectural Finishing, Water Supply, Sanitary Installation & Drainage Works of Stations from Chainage 55121.184m to 57357.623m of Line 7 Mukundpur – Yamuna Vihar Corridor of Phase -III Delhi MRTS. Contact No. CC-41
- Geotechnical Investigation for design and construction of elevated viaduct and four elevated station viz. MIA, Ghevra, Tikri Kalan and Tikri Border including architectural finishing, water supply, station installation, drainage and civil works on Mundka – Bahadurgarh corridor of phase-III of Delhi MRTS (Delhi Portion). Contract No.CC-47
- Geotechnical Investigation for Casting Yard (Rapid Metrorail Gurgaon South Extension Project)
- Geotechnical Investigation for DMRC for contract CC-43 at Mundka – Bahadurgarh Corridor.
- Geotechnical Investigation work at Ashram Station for DMRC project CC-24.
- Geotechnical Investigation work for DMRC project CC-15.
- Geotechnical Investigation work for Mundka-Bahadurgarh Corridor of Phase-III of Delhi MRTS (Haryana Portion)
- Soil Investigation work and Testing for DMRC Project CC-26R.
- Soil Investigation work and Testing for DMRC Project CC-32.
- Geotechnical Investigation work for DMRC-CC-29 at Sadar Bazar & Shankar Vihar of Delhi
- Geotechnical Investigation of DMRC- H. Nizamuddin to Mayur Vihar-I Excluding Uamuna Bridge, Mukundpur - Yamuna Vihar corridor (line-7) of Delhi MRTS (CC-19R)
- Geotechnical Investigation of DMRC- H. Nizamuddin to Mayur Vihar-I Excluding Yamuna Bridge, Mukundpur - Yamuna Vihar corridor (line-7) of Phase-III Delhi MRTS
- Additional Geotechnical Investigations & Testing for DMRC CC-05.
- Geotechnical Investigation for Design and Construction of Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Station at Azadpur by Cut & Cover method & Ramps at Mukundpur and Shalimar Bagh for underground works on on Kumund Pur – Yamuna Vihar Corridor of Delhi MRTS Project (DMRC) CC-04.
Delhi Metro Phase - II:
- Geotechnical Investigation for Elevated Corridor and Five Elevated Station (Garden Estate, Sikanderpur, DT City Centre, IFFCO Chowk and Sushant Lok) on Qutab Minar-Gurgaon of Delhi MRTS, DMRC Contract No. BC21.
- Geotechnical Investigation of, DMRC Project. Contract No. BC-24
- Geotechnical Investigation at Cut & Cover Area for Airport Metro Express Line AMEL-C1
- geotechnical investigation for construction of IGI airport station and cut & cover tunnel in airport area on New Delhi station – IGI airport corridor of Delhi MRTS project” under AMEL – C - 4 contract
- Soil Investigation from Talkatora Garden to Budha Jayanti Park. Airport Metro Express Line – AMEL-C6
- Geotechnical Investigation of Inderlok to Bhadurgarh MRTS Corridor of MRTS.
- Geotechnical Investigation for two (Section I & Section III) of DMRC.
- Soil Investigation in Station areas (Racecourse, Jorbagh, INA AIIMS)
- DMRC Project Contract – BC – 16, New Delhi
Delhi Metro Phase - I:
- Soil Investigation work for Delhi Metro-MC1A from ISBT to Vishwavidhalaya Package.
- Geotechnical Investigation for construction of staff quarters at Khyber Pass Depot of MRTS Delhi.
- Footing Load Test at workshop area at Khyber Pass Depot.
- Resistivity Test for ASS Locations (DMRC Contract SYS2)
- Integrity testing to confirm the length of Steel Kingpost for - Delhi Metro Project – MC1A.
- Geotechnical Investigation for two sections of DMRC, i.e Section –I From Central Secretariat to Rangapuri and Section III : Vishwavidalaya to Transport Nagar.
- Geotechnical Investigation for Chennai Metro.

Hydropower
- Geotechnical Investigation (Diamond Core Drilling) to envisage the rock strata at the junction of Adit-3 & HRT of Miyar Hydro Electric Project, Near Udaipur in District – Lahaul & Spiti, (H.P) India - In Progress
- Geotechnical Investigation & Geophysical Survey, rick mechanic, insitu test & Laboratory test and construction material survey for TIDONG _ II HEP Himachal Pradesh - In Progess
- Geological exploration by diamond core drilling, including driving, reaming of drill holes at different location of proposed Dam at Pakal and Power House (Lopara) of Bursar HE Project, Kishtwar – In progress
- Drilling of EX and NX for Hydro Fractures Test and PLT of Teesta Stage-IV HEP
- Geotechnical Investigation of Malana-III and Dhancho HEP in (HP)
- Drilling Work at Kuri, Gongri & Manas River, Kuri-Gongri HE Project. Bhutan
- Geotechnical Investigation of Bhilangana-IIA, IIB & IIC HEP in Uttarakhand
- Assessment of Construction Material (CA&FA) in terms of Quality and Quantity from various Quarries at Buhakha HEP (180MW)” at Bunakha, Chukha, Bhutan
- Geotechnical Investigation (Exploratory Core Drilling. Drifting and Testing) works at Bunakha Hydro Electric Project (180MW), Bunakha, Chukha, Bhutan
- Geotechnical Investigation for exact assessment of quality and quantity of RBM of borrow areas at Gairogi Sera, Bhason and Dekhoti for completion of KHEP and Tehri PSP
- Geotechnical Investigation & allied works for Mori – Hanol Hydro electric power project at Uttrakhand

Water and Environment
- Geotechnical Investigation work for Package 10 (Barahiya, Jamalpur, Jamui, Lakhisarai, Munger & Shaikhpura) Towns in Bihar
- Geotechnical Investigation for Package 7 (Ara, Bhabhua, Buxar, Dehri, Dumraon and Sasaram) Towns in Bihar.
- Water Treatment Plant at KM-4 site for Chambal Sawaimadhopur – Nadauti water supply Project under PHED Govt of Rajasthan
- Soil Investigation for Water Supply Scheme for Nangloi Project
- Geotechnical Investigation for Construction of ak-viaduct for high level feeder Canal Sifting from Km. 6.300 to Km. 7.497.
- Soil Investigation for Replacement of Water Mains in Delhi
- Geotechnical Investigation work for 53.5 MGD Sewage Pumping Station, Rising Main & Other related associated / allied Appurtenant on Design, Build and Operation Basis at Preet Vihar, New Delhi.
- Geotechnical Investigation work for Jal Vihar DJB Project
- Providing & Laying Twin Raw Water M.S. Gravity Main, from Haderpur to Wazirabad I/C ancillary work enroute. (On Design & Build basis) Pkg II (Ch. 6.0 Km to terminating point inside Wazirabad WTP)
- Construction of 25 MGD effluent pumping station at Rithala STP including P/L/J twin transmission mains for carrying 33.34 MGD treated effluent from EPS at Rithala to PPCL plant at Bawana on design, build and operate (DBO) basis, Delhi.
- Geotechnical Investigation at Wazirabad WTP and Pipeline, Delhi.
- Construction of 25 MGD Effluent Pumping station at Rithala ATP including P/L/J TWIN transmission mains for carrying 33.34 MGD treated effluent from EPS at Rithala to PPCL plant at Bawana, on design, build and operate (DBO) basis, delhi.
- Carrying out soil investigation work for “Design, construction – supply, laying & jointing, testing & commissioning of MS clear water mains from the 50 MGD WTP at Dwarka to various areas of Dwarka, Najafgarh, Daulatpur, Ujwa & IGI Airport.
- Geotechnical Investigation Construction of 25 MGD Effluent Pumping station at Rithala, STP including P/L/J, twin transmission mains for carrying 33.34 MGD.
- Geotechnical Investigation Work for “Design-Build-Operate 20 MGD WTP at Okhla & RWP Station at Wazirabad including Ancillary works”, Delhi.
- Geotechnical Investigation for Okhla site for Timarpur-Okhla MSW Project
- GI for eight towns of Haryana (JBIC Aided YAP II Project) for Preparation of Sewerage Master Plan.
- Geotechnical Investigation for Twin Raw Water MS Gravity Main, from Haiderpur to Wazirabad I/C Ancillary works WN-ROUTE for Package-I, Wazirabad WTP.
- Soil Investigation for 50 MLD Sewage Treatment of HUDA Plant at Sohna Road, Gurgaon
- Geotechnical Investigation for Ghazipur site for Ghazipur MSW Project.
- Geotechnical Investigation for Kachchh Brach Canal pumping scheme in Gujrat.
- Drilling at pumping station of SSNNL project
- Geotechnical Investigation for Chambal Sawaimadhopur Nadauti Water Supply Project
- Geotechnical Investigation for 35 MLD CEPT, Bawana Project
- Geotechnical Investigation for 90 MGD Effluent Pumping Station I/C rising mains and other related associated / allied appurtenant works on Design, Build & Operate Basis at Yamuna Vihar, Delhi

Industry
- Installation of Pile for New India Factory Project of M/s Daido India Pvt. Ltd. At Plot No. SP2-96, RIICO New Industrial Complex, Majrakath, Neemrana, Distt. Alwar, Rajasthan, India.
- Geotechnical Investigation for the Maruti Proving Ground project at Rohtak in Haryana
- Test Pile work for New Factory P/J for M/s Metal One Corporation, Maruti Suziki Suppliers Part, Manesar, Haryana (India)
- Soil Investigation for Industrial Project at Dharuhera.
- Soil Investigation for construction of Factory P/J for M/s Futaba & Maruti New JV at Plot No. ¼,5,8 & 9 Phase-3A, IMT Manesar, Haryana
- Soil Investigation for M/s. YMIPL at Plot No. A-3, Industrial Area, Noida-Dadri Road, Surajpur, Distt. G.B. Nagar (U.P)
- Soil Investigation for Proposed development on Plt No. 07, Tech Zone Greater Noida.
- Geotechnical Investigation for Structures at Pathredi Industrial Park.
- Geotechnical Investigation for wheel plant at Chhapara, Bihar
- Soil Investigation for Construction of Mitsuba’s New India Factory Project at Bilaspur-Taoru Road, Haryana
- Geotechnical Investigation for carrying out Drilling work, testing of sample and submission of report etc. for Bridges for 2 x 500 MW Anpara’D’ TPP Phase-I works of M/s UPRVUNL (2)
- Soil Investigation for M/s. YMIPL at Plot No. – A-3, Industrial Area, Noida-Dadri Road, Surajpur, Distt. G.B. Nagar (U.P)
- Piling work for Factory Project at Plt Nos. 33 to 35 and 46 to 48 Sector-7, HSIDC, Investate, Village Jaliawas, Bawal, Sistt. Rewari (Haryana)
- Ground Water Investigation for proposed site at National Institute of Biologicals, Noida.
- Soil investigation and resistivity test at 220/33KV substation at Masjid Moth in Delhi.
- Geological & Geotechnical sub-surface investigations for locating two additional PHWR units (KAPP 3 & 4) at KAKRAPAR, Gujarat State.
- PLT and Area Survey for Hydrogen and Hydrotreater plant at IOCL, Guwahati
- Soil Investigation work for 1x125 MW Giral Lignite Power Project against TN-1102.
- Earth Resistively Tests at our Roorkee Cement Grinding Unit.
- Geotechnical Investigation for setting up Wagon POH workshop at Sonpur, Bihar

Buildings
- Geotechnical Investigation work including drilling for Dunnu Resorts, Shail in Himachal Pradesh.
- Geotechnical Investigation work for Development of an ICD near Modinagar (UP) for Kribhco Infrastructure Ltd.
- Work Order for Piling for Shoring works for the Bus Terminal Cum Commercial Complex at Mohali, Pujjab
- Geotechnical Investigation for proposed construction of buildings (Ground +3/4 structure) for IGNOU Campus at Delhi.
- Soil Investigation work at ISBT, Kashmere Gate, Delhi
- Soil Investigation for Andhra Pradesh Bhawan Site at New Delhi
- Geotechnical Investigation for Hotel cum Convention Center at Dehradun
- Geotechnical Investigation for Propsed NBCC Depot Site
- Sub-Soil Investigation for Construction of New Terminal Building at Leh Civil Enclave Under Airport Authority of India.
- Geotechnical Investigation for Ginger Hotel – Pantnagar.
- Geotechnical Investigation for IT Bilding at Gurgaon.
- Geotechnical Investigation for proposed building (with single basement) at Plot No.65, Sectior-32, Gurgaon.
- Geotechnical Investigation for Construction of Gataam Budha University, Gr. Noida
- Geotechnical Investigation for the proposed Hospital of Dr. Negi at Section 21, Faridabad

Construction Material Testing
- Material Testing for Tallo Bheri (60 MW) Hydro Electric Project, Nepal
- Material Testing for Thuli Bheri -1 (110 MW) Hydro Electric Project, Nepal.
- Assessment of Quality and Quantity of construction material in various Quarries for Vishnugad – Pipalkoti H.E. Project.
- Material Testing for Raibareli – Tanda Section of NH-232 (Project Code 200806.AA.09.01)
- Material Testing for Rohtak – Hisar Section of NH-10 (Project Code 468778.AA.09.01)
- Material Testing for Raibareli – Banda Section of NH-232 (Project Code JXISRB901)
- Material Testing for Rampur – Kathgodam Section of NH-87 (Project Code JXRMKG901)
- Material Investigation for Yamunanagar – Panchkula Project Code-THDDYP-903)
- Material Investigation for Muzaffarnagar – Haridwar Project (Project Code THDDMH903)
- Soil Testing for Rothak Panipat Highway Preject (Code-THDDPR)
- Material Investigation for Haridwar – Dehradun Project (Project Code THDDHD901)
- Material Investigation for Chengapalli – Walayar Project (Project Code – THDDCW903)
- Material Testing for Pathankot – Amritsar (Project Code THDDPA901)
- Soil Testing of Aggredgate, Sand, Borrow Soil, Test Pit Material for various sites on near NH-08.
- Laboratory Testing of Soil Samples.
- Sample Testing for Detailed Design of Lucknow – Sultanpur Section of NH-56 from km. 11.500 to 134.700 in the state of Uttar Pradesh.
- Sample Testing for Samakhiali – Gandhidham section of NH-8A from km 306.00 to 362.160 in the state of Gujarat to be built on DBFOT pattern of BOT under NHDP-Phase V.
- Pavement Investigation and Material Survey for Preparation of Detailed Project Report for BRTS Corridor (Mukundpur to Kodli) in Delhi.
- Pavement Investigation and Material Survey for Preparation of Detailed Project Report for up-gradation of Ashram – Badarpur section of NH-2 (Km. 8.30 to Km. 16.100) including improvement of Intersection at Ashram (Mathura Road)
- CBR Testing (Three Energy Level) on each sample for Jabul Saraj – Surobi and Fayzabad – Eshkashem Road.
- Material Investigations for Barwa Adda – Panagarh Section of NH-2.
- Soil Testing for samples of the Package 8 & 9 of the Chhattishgarh Project.
- Laboratory testing of soil sample for JNV at Fatehpur and Kaushambi.
- Soil Testing on samples collected in Udhampur – Banihal Project.
- Soil Testing for NH-26 (Rajmarg Chauraha – Lakhanadon Project)
- Investigation Testing of Subgrade Material, Borrow Soils and Aggregates for DPR of 4-laning and strengthening of NH-57 from Km. 70.00 to Km. 0.00 for Darbhanga – Muzaffarpur section in the state of Bihar.

International
- Geotechnical Investigations (Diamond Core Drilling) f Bheri-3 HEP (480 MW) on River Bheri, District Jajarkot in Nepal.
- Material Testing for Tallo Bheri (60 MW) Hydro Electric Project, Nepal
- Material Testing for Thuli Bheri -1 (110 MW) Hydro Electric Project, Nepal.
- Assessment of Construction Material (CA & FA) in terms of Quantity and Quality from various Quarries for Bunakha HE Project (180MW), at Bunakha, Chhukha, Bhutan.
- Geotechnical Investigation (Exploratory Core Drilling Drifting and Testing) Works at Bunakha HE Project 180MW), at Bunakha, Chhukha, Bhutan.
- Exploratory Core drilling worrs on the river beds of Kuri, Gongri & Manas Rivers, Kuri-Gongri HE Projects, Bhutan.
- Topographic Survey of NH-4 from JABEL SARAJ (km 0+000) to SOURBI (km. 110+000) in Afghanistan.
- Geotechnical Investigation for Fire Station and Equipment Maintenance Building at KIA, Kabul in Afghanistan
- Geotechnical Investigation for bridges on Gardez – Khost Project, Afghanistan.
- Site Survey and Mapping work at Kabul Airport, Afghanistan.
- Geotechnical Consultancy Services for Abu Dhabi Project, Afghanistan.
- Geotechnical Investigation work for the Design of Bridges, in Afghanistan.
- Refraction Seismic Exploration Feasibility Study for Baghdara Hydropower Project, Afghanistan.
- Soil Investigation for Construction of Indian Chancery Complex at Kabul, Afghanistan.
- Electrical Earth Resistivity Tests for Four Bridges in Afghanistan.
- Geotechnical Investigation work for Rehabilitation of the Taloqan to Kishem Road in Afghanistan.
- Soil Investigation for foundation design for Shari Kohna Bridge in Baglan and Qala-e-Zal Bridge in Kunduz, Afghanistan.
- Refraction Seismic Exploration Feasibility Study for Baghdara Hydroelectric Project (Afghanistan)
- Geotechnical Investigation for JAF Site at Kabul International Airport, Kabul, Afghanistan.
- Soil Investigation for Proposed 220 kV Naibabad Switching Station in Afghanistan.
- Geotechnical Investigation work for Kandahar – Heart highway improvement Project Phase II, Package V in Afganistan.
- Material Testing for Sankosh MPP, Bhutan.