IGS Geotechnical Services LLP – Engineers & Consultants

Projects
Check our completed projects showcasing innovative geotechnical solutions that ensure stability and success for various construction and infrastructure endeavors.

Important River Bridges (Highways)
1 Soil Investigation for Delhi-Noida Bridge (Toll Bridge) over River Yamuna connecting Delhi & Noida.
2 Soil Investigation for Cable Stayed Bridge across Yamuna at Naini, Allahabad
3 Geotechnical Investigation for Cable stayed bridge over River Yamuna (Signature Bridge) downstream of existing bridge at Wazirabad, Delhi
4 Soil Investigation for Yamuna Bridge in Agra for Agra Ring Road Project.
5 Geotechnical Investigation for Major bridge across river Ganges (Mahatma Gandhi Setu) connecting Bakhtiyarpur to ShahpurPataori in Bihar
6 Geotechnical Investigation for Major Bridge over River Sone and Ganga on Patna Buxer Section of NH - 30 in Bihar
7 Geotechnical Investigation for Major Bridges over River Sutlej and Beas in Punjab
8 Geotechnical Investigation on land along the alignment of the proposed 'Chambal Bridge' Kota, Rajasthan
9 Geotechnical Investigation for Ganga & Yamuna Major River Bridge in Agra-Lucknow Expressway Highway Project.
10 Geotechnical Investigation for bridge over Godavri River, Nizamabad,
11 Geotechnical Investigations for Major Bridges across River Yamuna and Gandak (Eastern Peripheral Expressway)
11 Geotechnical Investigation for Construction of Four Lane Bridge with footpath cross River Ganga between Sultanganj (Bhagalpur District ) and AguwaniGhat (Khagaria District) including navigational span of cable stayed and approaches (connecting NH-31 and NH-80) in the State of Bihar on EPC mode
12 Geotechnical Investigation for construction of four lanes with paved side shoulder of Harike Bypass of NH-15 from existing km 158.350 to Km 166.925 in the state of Punjab under NHDP-IV - Major bridge over Sutlaj River
13 Soil Investigation work for Design & Construction of bridge over River ganga from NH-31 to ShivpuriDiyarNamberiMarg, at Sri Rampur Ghat in Distt. Ballia, UP.
14 Geotechnical Investigation work at construction of Yamuna Bridge at Km.34.84 on Agra ? Lucknow Expressway, FatehabadDistt. Agra, U.P
15 Geotechnical Investigation for Construction of High Level Bridge over River Mahanadi connecting Cuttack city to Nuapatana in the Distt. Of Cuttack in the state of Odisha on EPC basis.
16 Geotechnical Investigation for Ganga River Bridge for Four lanning of Bhojpur to Buxer Km 27.370 to Km 75.00 (Design Chainage Km 77.100 to Km 125.00) in the state of Bihar under NHDP Phase-III on EPC mode.
17 Construction of Substructure, Superstructure and River Training / Protection works for Rail cum Road Bridge over river Ganga between Ghazipur&Tarighat in connection with construction of New BG kine from Mau to Tarighat? in The State of Uttar Pradesh
18 Four / Six laning of Aunta - Simaria (Ganga Bridge with approach road) section of NH-31 from km 197.900 to 206.050 (design chainage) and (existing chainage km 204.741 to km 209.945 of NH- 31) [total design length - 8.150 km]" in State of Bihar
19 Construction of dedicated corridor (4 lane including extradose bridge river Ganga) of old, differently abled persons during Kumbh and Maghmela at Sangam, Allahabad
20 Geotechnical Investigation for Construction of Major Bridge Across Thane Creek (TCB III) - South
21 Geotechnical Investigation for "Design and Construction of Iconic Bridge (6 lanes) on EPC Basis Over River Krishna at Amaravati, Andhra Pradesh- in-progress.
22 Geotechnical Investigation for Versova-Bandra Sea Link Project
23 Geotechnical Investigation For Construction Of New 6-Lane Bridge With Approaches Parallel To Existing 2-Lane Bridge Over River Ganga At Phaphamau Near Allahabad In The State Of Uttar Pradesh
24 Geotechnical Investigation For New 4-Lane Bridge (Parallel To The Existing Mg Setu) With The Approaches From Km 0/000 To Km 14/500 Across River Ganga On Nh-19 At Patna In The State Of Bihar
25 Geotechnical Investigation Report For Construction Of Extra-Dosed Psc Bridge Over River Brahmaputra Connecting Guwahati And North Guwahati Including Via-Duct And Approaches Etc. On Epc Mode
26 Geotechnical Investigation for Construction of New 2-lane Bridge (Parallel to the Existing Naranarayan Setu) from km 0.000 to km 4.385 including approach road 50 m on Jogighopa side & 1990 m on Guwahati side across river Brahmaputra on NH-17 at Jogighopa in the State of Assam
27 Geotechnical Investigation for Construction of new 2-Lane Major Bridge including approaches over Brahmaputra River between Majuli on North Bank and Jorhat on South Bank from Km.11 .69To Km. 19.715. (Length of Bridge: 6812.50 Mtr)

Highway Projects
1 Consultancy Services for Geotechnical Investigation on 'Four laning of Kallagam to Karuppur from km. 38.700 to km. 50.382 and Two laning with paved shoulders from Karuppur to Meensurutti from km. 50.382 to km. 98.433 under NHDP phase - IV on Hybrid Annuity Mode in the state of Tamil Nadu
2 Consultancy Services for Geotechnical Investigation on 'Four Laning of Viluppuram to Puducherry Section of NH-45A in the State of Tamil Nadu
3 Consultancy Services for Geotechnical Investigation on 'Development of Purvanchal Expressway (Package-VIII) From Bijaura (Dist. Ghazipur) to Haidariya (Dist. Ghazipur) (Km 292+530 to Km 340+500) in the State of Uttar Pradesh on EPC Basis
4 Consultancy Services for Geotechnical Investigation on ' Six Laning & Strengthening of New NH-248A from existing Km 2+740 (Rajiv Chowk) to Km 11+682 in Gurgaon under NHDP Phase IV on Hybrid Annuity Mode (HAM) in the State of Haryana
5 Consultancy Services for Geotechnical Investigation for Rehabilitation and Up-gradation to Four Laning of Binjhabahal to Telebani Section, Km 414.000 to Km 491.710 (Design Chainage Km 414.982 to Km 493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP - IV, on Hybrid Annuity Mode
6 Consullancy Services for Soil investigation work on existing Yamuna River Bridge of NH-2 for "Six- Laning of Agra - Etawah Bypass from Km 199.660 to Km 323.525 in the State of Uttar Pradesh under NHDP Phase V on BOT (Toll) Mode
7 Providing Consultancy Services for Geotechnical Investigation_Vadodra-Mumbai (PKG-13)
8 Providing Consultancy Services for Geotechnical Investigation for ' Construction of Eight Lane Carriageway Talasari-Kim Expressway from Km 217+500 to Km 254.430 (Ena to Kim section of Vadodara-Mumbai Expressway) in the State of Gujrat
9 Construction of Eight Lane Carriageway starting at Haryana-Rajasthan border and ends at Junction with SH44 (Km 78+800 to Km 115+700) section of Delhi - Vadodara Green field Alignment (NH-148N)on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode_Work Order for Detailed Geotechnical Investigation
10 Soil Investigation for 'Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with SH-37A (Ch. 331.030 - 359.170) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
11 Construction of Eight Lane Access-Controlled Expressway Carriageway from Kamliya To Kandarwasa of Ratlam Design Ch.119.800 to Ch.150.000) Delhi-Vadodara on EPC Mode Under Bharatmala Pariyojana In State of MP
12 Construction of Eight Lane Access-Controlled Expressway Carriageway From Bawadi Village (Near Shivgarh) (Km 175+000) of Ratlam District to Ranni Village of Jhabua (Km 200+300), Delhi - Vadodara (NH-148N) Section of Delhi-Vadodara Green Field Alignment (Pkg-23) on EPC Mode Under Bharatmala Pariyojana in State of MP
13 6-Laning of Handia Varanasi section of NH-2 from km 713.146 to km 785.544 in the State of Uttar Pradesh under NHDP Phase-V on Hybrid Annuity Mode
14 Four Laning of Phagwara-Rupnagar section of NH-344A from Km 0.00 (Design Chainage) to Km 80.820 (Design Chainage) in the state of Punjab in Hybird Annuity Mode.
15 Design and Construction of Delhi-Meerut Expressway from dasna to Meerut - Km. 27.740 of NH-24 to Km. 51.975 of NH-58 (Design Chainage 28+000 to 59+777) in the state of Uttar Pradesh on EPC Basis (Length 31.777Kms)_Geotechnical Investigations
16 Geotechnical Investigation for Construction of 6 lane NH-344M - Package 1 (From NH 1,Km -0+700 to Karala-Kanjhawala Road, Km 15+000)in State of Delhi on EPC mode. (Pkg-1)
17 Geotechnical Investigation for Construction of Proposed Rewari Bypass (Design length 14.4 km) as a feeder route in the state of Haryana on Hybrid Annuity Mode(Package -IV)
18 Geotechnical investigation work for 'Annual Rate Contract - Construction of 6-lane access controlled Green field Highway from Km. 140.000 to Kmn 170.000 of Sangariya (Near Chautata)- Rasisar (Near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC Mode under Bharatmala Pariyojna (Phase-I) (AJ-SR-PACKAGE-6)
19 Geotechnical Investigation for development of Development of UER-2 between Design Chainage km 28+450 to 38+111.43 (Package-3) in the State of Delhi
20 Geotechnical Investigations for 'Construction of Elevated Structures including Approaches from Km 352+675 to Km 354+430 and VUP at Km 355+400 including approaches on NH-44 at Phagwara City in Sthe State of Punjab
21 Geotechnical Investigations for 'Construction of Eight Lane Carriageway starting near Junction with NH11 and ends after new railway line (under construction) (Km 183+000 to Km 214+260) section of Delhi - Vadodra Access Controlled Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
22 Geotechnical Investigations for 'Construction of Four Lane Champa Korba Katghora section of NH-149B from design ch. 0+000 to ch. 38+200, (From NH- 49 near Saragaon village to Bhaisma village) under NH (O) in the State of Chhattisgarh on HAM Mode
23 Geotechnical Investigations for '4- Laning of Dewas Ujjain section of Old SH18 from Design Ch. 0+000 to 19+733, Construction of 4-Lane Ujjain Bypass from Design Ch. 19+733 to 26+900 (Part I) and construction of 4-Lane Dewas Bypass from Design Ch. 0+000 to 14+520 (Part II) having total Design Length: 41.42 km in the State of Madhya Pradesh on HAM Mode
24 Consultancy Services for Geotechnical Investigation on 'Four laning of Kallagam to Karuppur from km. 38.700 to km. 50.382 and Two laning with paved shoulders from Karuppur to Meensurutti from km. 50.382 to km. 98.433 under NHDP phase - IV on Hybrid Annuity Mode in the state of Tamil Nadu
25 Geotechnical Investigation for Vadodara- Mumbai Expressway Package 13
26 Geotechnical Investigation for 'Construction of Four Laning of Rajauli-Bakhtiyarpur Section of New NH-20 (Old NH-31) Package-2 and 3
27 Geotechnical Investigation for Construction of Eight Lane access controlled Expressway from Hardeoganj village near Indergarh to Major Bridge on river (CH 319.400 to 331.030) (PKG-11) section of Delhi - Vadodara Green field Alignment (NH-148N) in the state of Rajasthan.
28 Geotechnical Investigation for 09 Packages of Amravati Akola AM-2 Project in Maharashtra.
29 Geotechnical Investigation for Construction of 8 lane Dwarka Expressway (NH-248BB PACKAGE IV from Rail Over bridge (ROB) till End point Km 40 NH-8-SPR intersection near Kherki Daula of 8.76 Km length, from Km 19.700 to Km 28.460 in the State of Haryana on EPC Mode
30 Geotechnical Investigation for Consultancy services for upgradation to 4-lane of Shimla to Mataur of NH-88 in the state of Himachal Pradesh
31 Geotechnical Investigation for four laning of Aunta - Simaria Ganga Bridge NH-31 in the State of Bihar
32 Four Laning of Chikhali-Tarsod (Pkg IIA) section of NH 6 from km 360.000 to 422.700 in the state of Maharashtra- for Geotechnical Investigation
33 Construction of Partially access controlled four lane elevated highway between SamralaChowk to Ludhiana Municipal Limit of NH-95 in the state of Punjab
34 Geotechnical Investigation for Delhi - Meerut expressway from km. 0.000 to km. 27.500 including 6/8 laning of NH-24 from km. 0.000 to km. 49.346 (Hapur bypass) in the state of Delhi and Uttar Pradesh - Package I - from existing km. 0.000 to existing km. 8.360 (Delhi up to UP border) in the state of Delhi on Hybrid Annuity Mode.
35 Geotechnical Investigation work for Babatpur - Varanasi, Uttar Pradesh
36 Geotechnical Investigation for development of six-lane Eastern Peripheral Expressway (NH-2) in the states of Haryana and Uttar Pradesh Package-V from km 93.000 to 114.000 on EPC mode.
37 Geotechnical Investigation & testing of soil & rock samples for development of ROBS IN LIEU OF LEVEL CROSSINGS HAVING TVU > 100,000 in state of Gujarat on BOTAnnuity Bassis.
38 Geotechnical Investigation works of Four laning of Ramban - Banihal section of NH-1A (New-44) from km - 151.00 to km- 187.00 in the state of Jammu & Kashmir under NHDP Phase II, on Engineering, Procurement & Construction (EPC) Mode.
39 Geotechnical Investigation for Design Consultancy Services for 8 Laning of section of NH-1 (New NH-44) (MukarbaChowk at Km 15.500 to Panipat Km 86.000) at MukarbaChowk.
40 Geotechnical Investigation for Preparation of Feasibility Report cum Detailed Project Report (DPR) for Capacity Augmentation to 2 lanes with paved shoulders configuration of National Highways in the State of Uttar Pradesh for Package - I (Km 0.00 to 128.00 of NH-19) (Length 128 km).
41 Geotechnical Investigation for Preparation of Feasibility cum Detailed Project Report for four laning of Ropar - Nawashahir-Banga-Phagwara Section of NH-344A in state of Punjab on EPC mode.
42 Geotechnical Investigation of Estern Peripheral Express Highway (NH-2)
43 Geotechnical Investigation for four laning of Jamugurihat to end of BiswanathChariali By-pass from Km. 182.00 - Km. 208.00 of NH-52 in the state of Assam Under SARDP - NE Phase -A.
44 Geotechnical Investigation for Jhansi - Banda - Allahabad - Mirzapur Section of Road (UP).
45 Geotechnical Investigation & Testing of Soil & Rock Samples at Proposed Structure Locations from Km. 30+000 to Km. 55+000 of Proposed Kathmandu - Nijgadh - Pathlaiyaterai / Madhes Expressway in Nepal.
46 Geotechnical Investigation for Preparation of design and drawings of road project from DogalKalan to Punjab / Haryana border Section of NH-71 from km 211.390 to km. 238.695.
47 Geotechnical Investigations and the Client are a firm of civil engineering consultants and have agreed to appoint the consultant to provide consultancy services pertaining to Topographic Survey for the Four / Two Lanning of Bikaner - Kolayat - Phalodi section of NH-15
48 Geotechnical Investigation for the preparation of feasibility report for package 8 i.e. Two laning with paved shoulder Km. 105 to Km. 174 of SH-32, comprising the section from Udaipur to Salumber (the 'Highway-I"); (ii) Km. 35 to Km. 212 of SH-62 comprising the section from Sojat to Pindwara (the 'Highway-II"); and (iii) Km. 37 to Km. 130 of MDR-26 comprising the section from Jasawantpura to Bhinmal - ChanchwaPhata (the 'Highway-III"); totaling 323 Kms.
49 Soil Investigation for the project for construction part alone of DTP Drain, BOX Culvert and allied works in Dibrugarh From Chainage 0 to 9500.
50 Geotechnical Investigation for preparation of detailed project report (DPT) for up-gradation of road corridors (Package III) on DBFOT basis in Punjab state - Package III B - additional consultancy work for the connecting roads to high level bridge (under construction) over river Sutlej at Mattewara.
51 Soil Investigation for construction part alone of DTP drain, box culvert and allied works in Dibrugarh from Chainage 0 to 9500m.
52 Soil testing for Prebid services- '4 laning of Numaligarh to Jorhat section of NH-37 from km. 402.500 to km. 453.00 (Design Chainage from ch 403.200 to Ch. 454.240) Excluding Desgaon Bypass from km 426.800 to km 437.420 (Design Ch. 427.400 to Ch. 438.720)" in the state of Assam,
53 Geotechnical Investigation of Preparation of Feasibility cum Detailed project report for balance works in 4-laning of Pathankot - Jammu section from Km. 80.00 to Km. 97.200 and Jammu Bypass including construction of new 2-lane Debak Bridge in Km. 78.00 on NH-44 (Old NH-1A) in the State of Jammu & Kashmir
54 Geotechnical Investigation works along NH-58 from Km. 6.800 (Delhi-UP Border) to Km 52.528 (Meerut Bypass)
55 Geotechnical Investigation / Consultancy Services for Preparation of Feasibilty Report for Upgradation of Kalewa - Yargy Road Section in Myanmar
56 Geotechnical Investigation works for preparation of Feasibilty of Four-Laning of Indore-Icchapur section of SH-27 in the state of MP.
57 Geotechnical Investigation at Flyover Locations for Delhi Agra Road Project
58 Geotechnical Investigation for proposed structure location of Milak Bypass of Moradabad Bareilly Section of NH-24 in the state of Uttar Pradesh
59 Geotechnical Investigation for Preparation of Feasibility Report cum Preliminary Design of National Highway 162 starting from Charbuja, Connecting Kumbalgarh, Haldighati, Nathwara, Mavli and terminating at Bhaterver on NH-27 in the state of Rajasthan.
60 Geotechnical Investigation for Construction of Flyover at Hero Honda Chowk on NH-8 at Km. 36+200 on Delhi-Gurgaon Expressway
61 Geotechnical Investigation work for Preparation of DPR for Up-gradation of Roads in Punjab (Package IIIA & IIIB)
62 Geotechnical Investigation work for Construction of flyover at Hero Honda Chowk on NH-8 at Km 36+200 on Delhi-Gurgaon Expressway.
63 Geotechnical Investigation for proposed structure location of Milak Bypass of Moradabad Bareilly Section of NH - 24 in the state of UP
64 Geotechnical Investigation work for NH-6 near Fulgaon Village, Jalgaon on deposit work for MSPGCL.
65 Geotechnical Investigation & testing of soil & rock samples at proposed structure location of Khed-Sinnar Section of NH-50 in Maharashtra
66 Geotechnical Investigation work for flyovers/rail over Bridge (ROB) at Dehradun, Uttarakhand
67 Geotechnical Investigation for Ring Road / Bypass around Srinagar City in J&K
68 Geotechnical Investigation work for 4-laning of Kashipur to Sitarganj Section of NH-74, UK
69 Geotechnical Investigation of One ROB/Bridge and Three Flyover at Itanagar, Arunachal Pradesh.
70 Geotechnical Investigation and testing of soil & rock samples for the structure of Kiratpur - NerChawk Section of NH-21 in HP
71 Geotechnical Investigation of Bikaner - Suratgarh Section of NH-15 in the state of Rajasthan
72 Geotechnical Investigation of Six No. of Bypasses on Gurgaon-Kotputli-Jaipur section NH-8 in the state of Haryana and Rajasthan
73 Geotechnical Investigation for preparation of DPR for rehabilitation and upgrading to 2-lane with pave shoulders configuration of NH-71, from Jind - Jalandhar in the Station of Haryana & Punjab - Addendum-III
74 Geotechnical Investigation of Raebareli-Jaunpur section of NH-231 in the state of Uttar Pradesh
75 Geotechnical Investigation of Aurangabad to BarwaAdda section on NH-2 From Km. 249.770 to 276.000 And Km. 276.000 to 320.800 in the state of Westbengal
76 Geotechnical Investigation for four laning of Lucknow - Raebareli section from Km. 12+700 to Km. 82+700 of NH - 24B in the state of Uttar Pradesh under NHDP Phase IV A on DBFOT (Annuity) Basis
77 Geotechnical Investigation of 4/6-Laning of Raipur-Bilaspur Section of NH-200 from Km. 0.00 to Km. 127+650 in the state of Chattisgarh under NHDP Phase - IV on DBFOT basis.
78 Geotechnical Investigation of Six Laning of Jaipur Ring Road from Ajmer Road to Agra Road section at Jaipur in the state of Rajasthan on DBFOT (Toll) basis (approx 47 Km length.
79 Geotechnical Investigation for widening and strengthening of the existing 2-lane road to a 4-lane divided carriageway from Km 256+550 (Kota) to Km 289+560 (Darah) and 2-lane Paved Shoulder from Km 289+560 (Darah) to Km 346+539 (Teendhar) Section of NH-12 on BOT Tool under NHDP Phase - III in the State of Rajasthan.
80 Geotechnical Investigation of Six Laning of Etawah-Chakeri Section of NH-2 in the state of Uttar Pradesh
81 Geotechnical Investigation of for Preparation of DPR for Bridges in Saharsa District in the state of Bihar
82 Geotechnical Investigation for structure of Beawar - Gomti Section of NH - 8 in the state of Rajasthan.
83 Geotechnical Investigation of for development of Seoni-Katangi Road (SH-54) in the state of Madhya Pradesh on BOT Basis (Length of Project Road - 75 Km).
84 Geotechnical Investigation of for Preparation of DPR for 3 Major Bridges in Silvassa, Dadra & Nagar Haveli.
85 Geotechnical Investigation for Preparation of DPR for 4 Major Bridges in Daman.
86 Geotechnical Investigation for the proposed 4.8 km long tunnel on SPUR alignment of Mumbai - Vadodara Expressway
87 Pavement Investigation and Materials Survey for Consultancy Services for Preparation of Detailed Project Report for BRTS Corridor (Mukundpur to Kondli) in Delhi.
88 Geotechnical Investigation for Bridges on Damoh - Hirapur Section in the state of Madhya Pradesh
89 Geotechnical Investigation Hazaribagh - Ranchi Section of NH-33 from Km. 40.500 to Km. 114.00 in the state of Jharkhand under NHDP Phase III on BOT (Annuity) Basis.
90 Geotechnical Investigation for the Preliminary Design for Development of Road Corridors and city bypass in Jamshedpur, Jharkhand through Public Private Partnership (PPP).
91 Geotechnical Investigation & Testing of Soil Samples at two toll plaza locations of Moradabad - Bareilly section of NH-24 in the state of Uttar Pradesh.
92 Geotechnical Investigation & Testing of Soil and Rock Samples for Major Bridge Km. 85.810 (Damodar River Bridge) of Hazaribagh-Ranchi section of NH-33 in the state of Jharkhand.
93 Geotechnical Investigation for Agra-Aligarh Road Project (from Chainage 0.000 Km to CH. 79.00Km Section NH-93)
94 Geotechnical Investigation for Jaipur Ring Road from Ajmer Road to Agra Road Section at Jaipur in the state of Rajasthan on DBFOT (Toll) Basis Project
95 Geotechnical Investigation for up-gradation to Two lane with paved configuration of Chapra -Gopalganj section of NH-85 in the state of Bihar
96 Geotechnical Investigation for consultancy services for detailed engineering for Four lanning of Patna - Bakhtiyarpur section of NH-30 from Km. 181.300 to Km. 231.950 in the state of Bihar under NHDP III on DBFOT Toll basis.
97 Material Investigation for BarwaAdda-Panagarh Section of NH-2
98 Geotechnical Investigation for Four Laning of Meerut Bulandshahr Section of NH-235 from Km. 7.469 to Km. 66.482 in the state of Uttar Pradesh
99 Geotechnical Investigation for Development and Peration&Maintenace of 'Ropar - Chamkaur Sahib - NeelonDoraha (up to NH-1) Road" on Design, Build, Finance, Operate & Transfer (DBFOT) basis in the state of Punjab.
100 Geotechnical Investigation for Six laning of Gurgaon-Katputly-Jaipur section NH-8 in state of Rajasthan.
101 Geotechnical Investigation for Design and Engineering Consultancy Services for Four laning of Delhi - Sharanpur - Yamunotri Road up to Uttarakhand Border from km. 10.911 to km. 217.000 in the state of Uttar Pradesh (SH-57) on Design, Build, Finance, Operate and Transfer (DBFOT) basis - Design Consultancy for Package IIIA , Package IIIB, Package I-F, Package I-E, Package I-D
102 Geotechnical Investigation for preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lanes / 2 lane with Paved Shoulders configuration of Narkanda - Wangtoo section (km. 224 to 335) of NH-22 in the state of Himachal Pradesh
103 Geotechnical Investigation for preparation of feasibility cum preliminary study for Udaipur Bypass, Between NH-76 & NH-8 in State of Rajasthan
104 Geotechnical Investigation for Preparation of DPR for Rehabilitation and Upgrading to 2-Lane of NH-87 Ext. Km. 0/0 to 109/0, from Jeolikot-Ghigarikhal.
105 Determination of Compaction of compacted earth embankment layers by standard tests on Yamuna Expressway Between Km. 57.00 to Km. 165.00
106 Sub Soil Investigation for the Project ' Consultant for Determining the suitability and feasibility of PPP Transaction and to implement agreed transactions between Uttar Pradesh State Highways Authority and the Concessionaire for State Highways in Uttar Pradesh:- Delhi - UP Boreder at Loni to UP-Uttarakhand Border of SH-57 Length=206.089"
107 Geotechnical Investigation & Testing of Soil Sample and Rock Samples of existing road section from Moradabad to Bareilly of NH-24 (Between existing Km. 148.00 to 262.00) in the state of Uttar Pradesh.
108 Geotechnical Investigation for Six Lanning of Indore Dewas section of NH-3 from Km. 577.550 to Km. 610.000 and from Km. 0.000 to Km. 12.600 of National Highway No. 3 in the State of Madhya Pradesh.
109 Geotechnical Investigation for preparation of feasibility cum preliminary design for construction of standalone ring road / bypass in Indore City in the state of Madhya Prasesh under NHDP Phase-VII.
110 Geotechnical Investigation work for the Design of Road from Balasore to Kharagpur on NH-60 in the state of West Bengal (Phase-II)
111 Geotechnical Investigation work for the Design of Bridges / Flyovers in Amravati to Gujarat / Maharashtra Border from km. 550 to km. 649 on NH-6 in the State of Maharashtra (Package-I to VI)
112 Geotechnical Investigation work for preparation of detailed design / Drawing for JAHU Bridge in the state of Himachal Pradesh.
113 Geotechnical Investigation work for Design of Bridges / Flyovers, in Patiala-Bathinda from km 62.50 to 209.50 on NH-64 in the State of Punjab.
114 Geotechnical Investigation work for the Design of road from Blasore to Kharagpur on NH-60 in the state of West Bengal (Phase-I)
115 Geotechnical Investigation for Preparation of DPR for rehabilitation and upgrading to 2-laning with paved shoulders configuration of NH-71, from Jind-Jalandhar in the State of Haryana & Punjab.
116 Geotechnical Investigation work & Testing of Soil and Rock Sample for Preparation of DPR of Godhra-Gujrat / MP Border Section of NH-59
117 Soil Testing for Bagodara-Watanam-Tarapur-Vasad Section of NH-8, (Project Code THDBSC901)
118 Geotechnical Investigation for Feasibility and Preparation of DPR for up-gradation of Ashram-Badarpur section of NH-02 (Km. 8.30 to km 16.100) including improvement of Intersection at Ashram (Mathura Road)
119 Geotechnical Investigation for Preparation of DPT for Rehabilitation and Up-gradation of NH stretches under NHDP-IVB-Gourp B: Package 7 in the state of Maharashtra (Solapur-Yedishi section of NH-211 and Dhule - Aurangabad section of NH-211)
120 Geotechnical Investigation for preparation of DPR for GAD Square Flyover in Bhopal City.
121 Geotechnical Investigation for Bridge No. 139 & in between chainage Km 147/100-Km 147/500 on Dharma-Quazigund Section in J & K.
122 Geotechnical Investigation for detailed design of tow flyovers at km 52+530, km 56+170 & additional viaducts on Kalka side of ROB at Km 41+001 on Himalayan Expressway.
123 Six Laning of Indore-Dewas Section of NH-3 from km 577.550 to km 610.00 and from km 0.00 to 12.600 in the state of Madhya Pradesh (Length 45 Km)
124 Geotechnical Investigation work for Construction of 4 lane flyover at JamalpurChowk on Ludhiana-Chandigar Road at Ludhiana.
125 Geotechnical Investigation work for Design, Engineering, Finance, Construction, Operation and Maintenance of 'Two Laning of Muzaffarpur-Sonbarsa Section of NH-77 (from km 2.8 to km. 89.00) in the state of Bihar Under NHDP III on DBFOT Annuity basis"
126 Geotechnical Investigation work for Detailed Design and Drawings for Four Laning of Barhi-Hasaribagh section of NH-33 from Km.0.00 to Km. 41.313 in the state of Jharkhand.
127 GI for Bridges/Structures and Material Investigations for Detailed Project Report for Rehabilitation and upgrading to 2-lane with paved shoulders configuration of Narsinghpur - Harrai - Amarwara section of SH 47 in the state of Madhya Pradesh (Length 90 km.)
128 Sub-soil investigation for proposed interchange at Amramarg with NH- 4 B near GavhanPhata in Mimbai, Mharashtra state.
129 Material investigation for Muzaffarnagar - Haridwar Project (Project code THDDMH903)
130 Soil Testing for RothakPanipat Highway Project (Code-THDDPR)
131 Geotechnical Investigation for the proposed 290 m long Sirohi Bypass tunnel along NH - 14 in the state of Rajasthan
132 Geotechnical Investigation for Bridges and ROBs at Raebareilly-Allahabad Section of NH-24 B and Kanpur-Kabrai Section of NH-86.
133 Geotechnical Investigation for Improvement / upgradation of Jahanbad-Ghosi-Islampur-Rajgir-Giriyak-Parwatipur Road (85 Kms) of Bhihar State Highways Project (SH-71)
134 Geotechnical Investigation Work For the Design of Bridges / Flyover, in AGRA - Itawah - NH - 2 (UP)
135 Geotechnical Investigation Services for Bridges at UNA BARSAR Road Project
136 Geotechnical Investigation Improvement / up gradation of Hajpur - Lalganj - Vaishali-Manikpur - Deoria, Sahebganj - Kesharia - Khjuria - Areraj Road (SH-74).
137 Geotechnical Investigation Improvement & Up gradation of Kursela - Forbesgang Road BIHAR.
138 Design & construction of formation including blanketing, major bridge, minor bridges RUBs, ROBs supply & spreading of Ballast and other work at state of BIHAR & UP in India.
139 Sub-Soil investigations (Bridges / Structures / along road) for preparation of Detailed Feasibility Study and preparation of Bid Documents for proposed Ganga Express Driveway along the Southern Bank of river Ganga at Patna.
140 Geotechnical Investigation for Bridges, ROB etc for Munger Bhagalpur Section of NH - 80
141 Geotechnical Investigation for minor bridges / retaining walls for Hodel-NahuTabdu-Vilaspur - Section.
142 Geotechnical Investigation for Flyover at Bhogpur Panjab.
143 Geotechnical Investigation and Sub-Soil Exploration for Bridges and other structures and Embankments along proposed Ganga Expressway Project.
144 Geotechnical Investigation for 150 mm dia confirmatory borehole for BhutahiBalam Bridge site C-11/BR - 06 Project at Bihar.
145 Geotechnical investigation & Testing of Soil and Rock Sample for Preparation of detailed Design and Detailed Project Report of Various projects for REL PUNJAB Expressway Greenfield Project.
146 Geotechnical Investigation Work for the Design of Bridges/Flyover for Mohali PhagwaraExp-way.
147 Geotechnical Investigation on NH-21 (Km. 28.60 to 73.20) Under NHDP in Punjab on BOT Basis Phase -IIIA for Pkg. No. NHDP-III/BOT/IV/03
148 Geotechnical Investigation for 4/6 laeKundli - Manesar - Palwal Expressway in Haryana on BOT basis
149 GI for finding out the safe Bearing Capacity of the strata at the founding level of Bridges of NH-26
150 Geotechnical Investigation for widening of UP link road from 6 lane to 8 lane and making signal free junctions by providing clover leaves.
151 Geotechnical Investigation for Jaipur Ring Road Development Corridor in Rajasthan.
152 Geotechnical Investigation for Bridges of Road Subprojects in Jammu & Kashmir-DSC-IV (Kashmir Transport Project C-703)
153 Geotechnical Investigation for preparation of DPR of various project for Chhattisgarh Accelerated Road Development Programme (CARDP), Phase I in Chhattisgarh.
154 Geotechnical Investigation work for Bridge and elevated structures, for six-laning of NH-4 & 46 from Krishnagiry-Walahjpet in the state of Tamilnadu Under NHDP (Phase-V (Lot-2) (Length 143 km)
155 Preparation of DPR for Kurali - Kiratpur Section of NH-21 Under NHDP Phase-IIIA on BOT Basis
156 Geotechnical Investigation & Rock Drilling for 4/6 lane Kundli - Manesar - Palwal Expressway in the state of Haryana on BOT basis
157 Soil Exploration Investigation - for preparation of Feasibility for 6 laning of Gurgaon - Jaipur of NH8 Phase - V
158 Geotechnical Investigation for preparation of DPR for Lakhnadon (Km 547/450)-Seoni (Km 596/150) Section on NH-7 in the State of MP under BOT (Annuity) Scheme.
159 Geotechnical Investigation for Major / Minor Bridges for 4 Laning of NH 86 Ext from Sehore to Dewas Section in the state of Madhya Pradesh
160 Geotechnical Investigation for Proposed Flyovers, Bridges & Other minor structure site for KMP Expressways Ltd. From Km. 66 to 135.600.
161 Preparation of DPR for the Construction, Up-gradation, Operation and Maintenance of Patiala-Nabha-Malerkotla project road in Punjab,
162 Pilling work for construction of various structure at package CII-BR-9 of East West corridor, part of NH-57 near Muzaffarpur.
163 CII-BR-8 of East West corridor, part of NH-57
164 CII-BR-6 of East West corridor, part of NH-57
165 Soil Exploration investigation - consultancy services for preparation of Feasibility for 6 lanning of Gurgaon - Jaipur of NH-8
166 Geotechnical Investigation for Package AP-8 Kadtal to Armur Section of NH-7 in Andhra Pradesh
167 Geotechnical Investigation on NH-21 under NHDP in Punjab on BOT basis Phase - IIA for Pkg. No. NHDP-III/BOT/IV/03.
168 Geotechnical investigation for Tunnel on NH-54 in Harangajao-Maibong in the state of Assam.
169 Geotechnical Investigation for Jammu - Pathanko Section of NH-1A at 3 Bridge.
170 Preparation of DPR and good for construction and as built drawings as well as support during construction for the Rehabilitation and strengthening of Existing 2-Lane Road and Widening to 4 Lane Dual Carriageway Configuration of Raipur - Aurang Road on National Highway No.- 6 in the State of Chhattisgarh, (India)
171 Geotechnical Investigation for Jaipur-Kishangarh Expressway (NH-8) Package II.
172 Geotechnical Investigation for existing 2-lane road for 4-lane dual carriageway of NH-1 (Jalandhar-Amritsar section) Punjab BOT basis.
173 Geotechnical Investigation for ROB's along Kishangarh - Hanumangarh Section of SH-7.
174 Geotechnical Investigation for ROB's in different cities of Punjab.
175 Geotechnical Investigation for Major & Minor Bridge site from Muzaffarpur to Darbhanga of NH-57 (Bihar)
176 Geotechnical Investigation for the proposed Bridges and Overpasses of Nagpur section of NH-7 Package No. C11/C-6)
177 Geotechnical Investigation for Jalandhar-Pathankot Section of NH-1A (Km. 26.00 to 110.00).
178 Sub-Soil Investigation for Flyover at Chiravantand at Patna, Capital of Bihar.
179 Sub-Soil Investigation work for Proposed Flyovers/Bridges/ROB's etc, for Ranchi Outer Ring Road
180 Sub-Soil Investigation for road and Bridge work Jammu - Pathankot Highway
181 Soil Investigation at Bridge location between Jammu - Udhampur Section
182 Soil Tests for NH-26 (RajmargChauraha - Lakhanadon Project )
183 Geotechnical Investigation for the proposed bridges on NH-24 (Hapur to Moradabad)
184 Geotechnical Investigation for Nagpur Dhule Section of NH 6 (Km. 9.20 to 100.00)
185 Geotechnical Investigation for Upgradation of Ahmdabad - Mumbai Sectionof NH-8
186 Geotechnical Investigation for 4 laning of Simrahi - Jhanjharpur of NH - 57
187 Geotechnical Investigation for Rehabilitation and Upgrading to 4-lane Divided Carriageway Configuration of Six Section of National Highway Stretches in Bihar (Gopalganj - Chhapra - Hajipur) on NH - 85, NH-19
188 Geotechnical Investigation for NH-8 'Delhi -Gurgaon Expressway"
189 Material Investigation for Mohammadpur - Lakhnadon Section of NH-26 (Km. 351 to Km. 405.77)
190 Piling work for Construction of BirTekendrajeet Flyover Near Maharani Bridges at IMPHAL
191 Geotechnical Investigation for Detailed Feasibility & Engineering Report for (i) Baran - Mangrol-SawaiMadhopur - Bharoty-Gangapur-Bayanna-Bhartpur in Rajsthan& (ii) flyovers / elevated highway between KhasaKothi and Govt. Hostel Intersections.
192 Geotechnical Investigation for Four-Laning Project of NH1-A From Udhampur to Banihal (Km. 66-188) in J&K
193 Preparation of Feasibility and DPR of 4 laning and strengthening of NH57 from Km. 70.00 to 0.00 for Darbhanga - Muzaffarpur in Bihar
194 Geotechnical Investigation for up-gradation of Panipat to PanchiGujran Haryana Under North-South corridors Project Km 66.00 to 86.00on NH-1
195 Rehabilitation and upgrading of existing road to 4-lane divided carriageway configuration of Patna Busar Stretch on NH-30 & NH-84 in the state of Bihar Under NHDP Phase-III (10000 km) programme - Feasibility study preparation of detailed project report.
196 Geotechnical Investigation for 4 laning of Lalitpur-Sagar Section of NH-26
197 Geotechnical Investigation for DPR for four / six laning from Amritsar to Pathankot of NH-15 (Punjab)
198 Geotechnical Investigation for four / six laning from Amritsar to Pathankot on NH-15 in Punjab
199 Sub-soil Investigation for Bridges / ROBs for Development of NH-57, Section Darbhanga - Jhanjharpur in Bihar
200 Preparation of DPR for 450 km of selected SH in MP

Major Highway Tunnel Projects
1 Geotechnical investigation for 'Four laning of Ner Chowk - Pandoh including Pandoh Bypass Section of NH-21 (Package-1 Km 190.000 to Km 221.305) under NHDP-IVB in the State of Himachal Pradesh through an Engineering, Procurement and Construction (EPC) Contract (Design Length 26.290 Km)'
2 Geotechnical investigation for 'Four laning of Ner Chowk - Pandoh including Pandoh Bypass Section of NH-21 (Package-1 Km 190.000 to Km 221.305) under NHDP-IVB in the State of Himachal Pradesh through an Engineering, Procurement and Construction (EPC) Contract _03 Highway Tunnels
3 Geotechnical Investigation for Zozila Tunnel along the National Highway 1 (Srinagar - Sonamarg - Guri section) in State of Jammu & Kashmir_Tunnel of 14 Km long
4 Integrated Transit Corridor Development Plan in & around PragatiMaidan Underground Tunnel, Underpas, FOB, Loops, Ramps
5 Geotechnical Investigation for preparation of DPR for construction of Road Tunnel, Viaduct &Churhat Bypass of Rewa-Sidhi Section of NH-75E from Ch.33/200 to 55/400 in the State of Madhya Pradesh.
6 Geotechnical Investigation for Parwanoo-Solan Section of NH-22 (Now-5) from Km. 67.000 to Km. 106.000 on EPC Mode under NHDP Phase -III in the State of Himachal Pradesh_ Tunnel of 820m long
7 Geotechnical Investigation & Testing of Soil & Rock Samples of Tunnel for Development of Kathmandu - Nijagadh - PathlaiyaTerai / Madhes Expressway Project through PPP on BOT Basis in Nepal_ Tunnel of 1300m long
8 Geotechnical Investigation for the proposed 290m Long Sirohi Bypass tunnel along NH-14 in the state of Rajasthan
9 Geotechnical Investigation for the proposed 4.80 Km Long Tunnel on SPUR alignment on Mumbai - Vadodra Expressway
10 Geotechnical Investigation & Testing of Soil & Rock Samples for the Tunnel 1 to 5 of Kiratpur - NerChawk Section of NH-21 in the station of Himachal Pradesh.
11 Geotechnical Investigation for Z-MORH Tunnel (Highway tunnel of about 6.4 Km) on National Highway No.1D (Srinagar SonmargGumri Road) in the State of J&K on DBFOT Annuity Basis, (Hilly and Mountainous Terrain)
12 Geotechnical Investigation for Vadakanchery - Thrissur Section of NH-47 (Project Code THVYTR903) - Tunnel Portion
13 Consultancy Services for Preparation of DPR for four-Laning of proposed Shimla Bypass from Kaithlighat to Dhalli Section of NH-22 (Chainage from Km.129.050 to Km.156.507)in the State of Himachal Pradesh on EPC Mode_Geotechnical Investigations for Tunnels
14 Geotechnical Investigations for 'Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch. 158+675 to Ch. 164+660 (North Bound) and Ch. 160+282 to Ch. 163+368 (South Bound connecting with Existing Tunnel-T4) excluding Ch. 161+544 to Ch. 164+100 (North Bound) including Construction of Twin Tube Tunnel (Package-II) in the UT of Jammu & Kashmir on EPC Mode - In progress
15 Geotechnical Investigations for 'Rehabilitation and Upgrading of Existing 2 lane to 4 lanefrom Bhangbar (Near Ranital) to Kangra Bypass Section of NH-88 (New NH-205) up to Intersection with NH-154 (Design Chainage - Km 175+270 to Km 193+400, Design Length-18.130 Km) in the State of Himachal Pradesh' - Tunnel - In progress

Hydropwer Projects
1 Carrying out Exploratory Core Drilling and Associated In-Situ Tests for Gamri-I Hydropower Project (Running)
2 Carrying Out Drift In-situ Tests for Jomori Hydropower Project
3 Carrying out Exploratory Core Drilling and Associated In-Situ Tests for Gamri-I Hydropower Project'
4 In - situ rock mechanic testing at Proposed Dam Site Drifts of Nyera Amari - I & II integrated Hydropower Project,
5 In - situ Rock Mechanic Testing at Proposed Power House Drift of Pakal Dul Hydro Electric Project, Jammu & Kashmir
6 Geological exploration by diamond core drilling, including driving, ramming of 11 Nos. drill holes at different locations of proposed Dam at Pakal and Power House (Lopara) of Bursar HE Project, Kishtwar J&K
7 Soil and Rock investigation for Bursar H.E. Project, Kishtwar J&K
8 Additional Surface, Sub-surface Exploration & Laboratory Investigations at new Surge Shaft location & Downstream Surge Gallery at Power House of Kuri-1 HPP.
9 Geotechnical investigation works for Parwan Dam &Tunel Project
10 Execution of works like construction of exploratory drift at Power House site, preparation of concrete blocks & strengthening of plates for in situ tests in Dam site drifts and core drilling of Nx/Bx and Ex size holes for Devsari HEP Tharali, Distt. Chamoli (Uttarakhand).
11 Diamond Core Drilling for Geotechnical Investigation at Kamala Dam Complex (Spillway area, HRT including Intake, Surge Shaft, Pressure Shaft and Power House) of SunKosi Storage-cum Diversion Scheme near Timnai, District - Udaipur, Nepal (Package-C Revised).
12 Sub-Surface Explorations and Laboratory Investigations at various Project Components of Kuri-I Hydropower Project, Mongar, Bhutan. (Package No. I, Package No. IV, Package No. V)
13 Geotechnical Investigation (Diamond Core Drilling) for study of rock strata near HRT alignment of SELHI HEP near Udaipur in District Lahaul&Spiti, H.P. India
14 Geotechnical Investigations (Diamond Core Drilling) of Bheri-3 HEP (480 MW) on River Bheri, District Jajarkot in Nepal.
15 Geotechnical Investigation (Diamond Core Drilling) to envisage the rock strata at the junction of Adit-3 & HRT of Miyar Hydro Electric Project, Near Udaipur in District - Lahaul&Spiti, (H.P) India
16 Geotechnical Investigation & Geophysical Survey, rick mechanic, insitu test & Laboratory test and construction material survey for TIDONG _ II HEP Himachal Pradesh
17 Geological exploration by diamond core drilling, including driving, reaming of drill holes at different location of proposed Dam at Pakal and Power House (Lopara) of Bursar HE Project, Kishtwar.
18 Drilling of EX and NX for Hydro Fractures Test and PLT of Teesta Stage-IV HEP
19 Geotechnical Investigation of Malana-III and Dhancho HEP in (HP)
20 Drilling Work at Kuri, Gongri&Manas River, Kuri-Gongri HE Project. Bhutan
21 Geotechnical Investigation of Bhilangana-IIA, IIB & IIC HEP in Uttarakhand
22 Assessment of Construction Material (CA&FA) in terms of Quality and Quantity from various Quarries at Buhakha HEP (180MW)' at Bunakha, Chukha, Bhutan
23 Geotechnical Investigation (Exploratory Core Drilling. Drifting and Testing) works at Bunakha Hydro Electric Project (180MW), Bunakha, Chukha, Bhutan
24 Geotechnical Investigation for exact assessment of quality and quantity of RBM of borrow areas at Gairogi Sera, Bhason and Dekhoti for completion of KHEP and Tehri PSP
25 Geotechnical Investigation & allied works for Mori - HanolHydro electric power project at Uttrakhand

Indian Railways Projects
1 Geotechnical Investigation for Mumbai-Ahmedabad High Speed Rail Corridor (Package-C-4 & C-6), L&T Constructions
2 Geotechnical investigation (GT) in connection with construction of new line Between Khategoan (Excl.) to Mangliyagoan (Incl.) (Approx. 100 Km) Package-II
3 Geotechnical Investigation for Railway Grade Separator at Katni.
4 Geotechnical Investigation for Mumbai-Ahmedabad High Speed Rail Corridor (Package-I)
5 Geotechnical Investigation for North Portal of PirPanjal Tunnel of T-80 Package-T80 Zone -V on DQ Section of JKRLP, Banihal J&K
6 Determination of Bearing Capacity by Conducting Plate load tests at  Bridge location of Br. No. 150B, 153, 157C, 160, 160A in zone VI of USBRL New Rail Line Project.
7 Geotechnical Investigation for Techno-Economic Feasibilty Study for Light Rail Transit System (LRT) Project
8 Geotechnical Investigation for Bogibeel Rail – Cum – Road Bridge on river Bramputra at Dibrugarh, NF Railway.
9 Geotechnical Investigation for Bridge Between Km. 126 to 142 and 163 to 168 of Katra – Qazigund Rail Link Project (J&K) 
10 Geotechnical Investigation for Bridges and Tunnel between 91 to Km. 102 of Katra – Quazigund Rail Like Project, at J & K
11 Geotechnical Investigation for Bridges and Tunnel between 75 to Km. 91 of Katra – Quazigund Rail Like Project, at J & K
12 Geotechnical Investigation work for Rapid Rail Transit System for Delhi-Ghaziabad-Meerut Corridor
13 Soil Investigation in 132 KV transmission line from Block Hut Z to Panki / TSS and Panki / TSS to Sarsaul (Krishna Nagar) over Allahabad Division of Northen Railway
14 Special Geotechnical Investigation for carrying out Insitu tests such as Footing Load Test, Insitu Shear Test (CBT) required for the Design of Major Bridges between km 50 -75 of Katra – Laole section of USBRL Project of Northern Railway.
Dedicated Freight Corridor Projects
1 Geotechnical Investigation for Eastern DFC Project CTP 303
2 Geotechnical Investigation for the ETMJ-2, ETMJ-4 and ET RUB-19 for 3 locations in Slice 101
3 Geotechnical Investigation work for Western Dedicated Freight Corridor-Package-D, CTP 1 & 2 (Rajasthan & Gujarat)
4 Geotechnical Investigation work for Western Dedicated Freight Corridor-Package-C, CTP 1 & 2 (Rajasthan)
5 Geotechnical Investigations at different Structure Locations / Tunnel for WDFC CTP-14 Project_ Structures and Tunnel
6 Geotechnical Investigation For Dedicated Freight Corridor Project (Western Corridor-Phase-2), Package-Ctp-15c.
7 Geotechnical Investigation For Design And Combined Package CTP-1 & CTP-2 For Rewari - Iqbalgarh Section Of Western Dedicated Freight Corridor (Confirmatory Boreholes In The RFO, Major Bridge And Important Bridge Locations.
8 Geotechnical Investigation work of Eastern DFCC from Mughalsarai to Mirzapur Detour (Package 201-1 Km. 119+550 to Km. 187+550 Including link lines).
9 Confirmatory Geotechnical Investigation for Major Bridge locations at, CPT-1&2.
10 Geotechnical Investigation for Double Line Railway involving formation in Embankments / Cutting, Ballast on formation, Track works, Bridges, Structures, Buildings, Yards, Commissioning on Design-Build Lump-Sum Basis for Mughalsarai-New Karchana Station (including) of Eastern Dedicated Freight Corridor Project (Contract Package-201) .
11 Geotechnical Investigation for the ETM-1 and Etawa Detour only for 3 location n Slice 101.
12 Geotechnical Investigation for rock cutting section more than 5m for Western Dedicated Freight Corridor Project (CPT-2) between DFCC Ch. 67933 to 68037.
13 Geotechnical Investigation for rock cutting section more than 5m for Western Dedicated Freight Corridor Project (CPT-2) Between Haripur to Bangurgram.
14 Geotechnical Investigation for the DFCCIL package 201 in section between Mughalsarai - Allahabad - Kanpur in the state of Uttar Pradesh.
15 Geotechnical Investigation for Minor bridges Type - 1 & 2 for WDFCC PKG - 1&2, Section 1 & 2 (Approx. 450 Kms) in the state of Haryana, Rajasthan and Gujarat
16 Geotechnical Investigation for Western DFCC Project, Pakage 12 & 13 (Vadodara-Vaitarana)
17 Geotechnical Investigation for Design and Construction of Civil, structures and Track Works for Double Line Railway involving formation, track works, bridges, structures, buildings including testing and commissioning on Design-Build lump sum basis for Bhaupur - Khurja section (300 Kms) of Eastern Dedicated Freight Corridor in the state of Uttar Pradesh
18 Geotechnical Investigation work for Station Buildings & Allied Structure for WDFCC PKG-1&2,Section-1
19 Geotechnical Investigation for Design & Construction of Formation including blanketing, Major bridges, Minor bridges, RUBs, ROBs, Supply & Spreading of Ballast and other related infrastructure works for Dedicated Freight Corridor from Ch. 14.108 to Ch 119.437 Km. on Mughalsarai - Sonenagar section of Eaqstern Corridor in the state of Bihar & U.P in India
20 Geotechnical Investigation work for DFCCIL Project new Karwandiya to GanjKwaja on Mohalsari-Sonenager Section of Eastern Corridor, Bihar & UP
Metro Rail / NCRTC Projects
1 Geotechnical Investigation for Contract Package KNPCC-05: Design and Construction of Tunnel from start of elevated ramp (after Motijheel Station) to end of Nayaganj station including four underground metro stations (viz. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj) and ramp including Architectureal finishes, E&M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India
2 Geotechnical Investigation for "Contract: DC-01-Part Design and Construction of elevated Viaduct, Elevated Ramp, siding line and Ten Elevated stations viz. Keshopur, Pashchim Vihar, Peeragarhi, Mangol Puri, West enclave, Pushpanjali, Deepali Chowk, Madhuban Chowk, Prashant Vihar & North Pitampura (Excluding Architectural Finishing works of stations, Steel FB & PEB work of stations) from (Chainage 2831.235 mt. to 15206.166mt.) of Janakpuri West to R.K. Ashram Corridor (Extn. Of Line-8) of Phase-IV of Delhi MRT"
3 Geotechnical Investigation for "Contract: DC-02- Part Design and Construction of Elevated Viaduct from Maujpur (excluding) to Majlis Park (excluding) including Bridge across river Yamuna, Integrated Elevated Viaduct with PWD flyover at lower deck & metro line at upper deck from Yamuna Vihar to Bhajanpura and 08 Elevated Stations viz. Yamuna Vihar, Bhajanpura, Khajuri Khas, Sonia Vihar, Soorghat, Jagatpur Village, Jharoda Majraa and Burari (including Entry & Exit structures at stations but excluding Architectural finishing, Pre-engineered steel roof structure and roof sheeting of stations) from Chainage 0.0 M to 12098.520 M of Majlis Park - Maujpur Corridor of Delhi MRTS Phase-IV project"
4 DMRC Contract DC-03R: Geotechnical Investigations for Part Design and Construction of Elevated Viaduct, Elevated Ramp, Siding lines, Viaduct for connection to Mukundpur Depot and four Elevated Stations viz. Bhalswa, Majlis Park, Azadpur and Ashok Vihar {Excluding Architectural Finishing works, Steel FOB (except at Ashok Vihar station which is including) & PEB works of stations} from Chainage 15206.166 m to 22680.000 m of Janakpuri West to R.K. Ashram Corridor (Extn. Of Line-8) of Phase-IV of Delhi MRTS and partly integrated and partly independent flyover of PWD between Azadpur and Derawal Nagar on G.T. Road."
5 Geotechnical Investigation for "Contract: DC-04- Geotechnical Investigation Work for Tuglakabad-Terminal 1, IGI Airport corridor, Lajpat Nagar-Saket G Block corridor & Saket G Block to Chhattarpur corridor of Phase-IV of Delhi MRTS Project
6 CONTRACT: DC-06- Design and Construction of twin tunnel by Shield TBM, Cut and Cover Tunnel Box, underground ramp and one underground Station namely Krishna Park Extn. with entry/exits & connecting Subway by box pushing method including Architectural finishing, Water supply, Sanitary installation & Drainage works from chainage 805.110 mt. to 2830.863 mt. (up line) & from chainage 788.198mt to 2814.745 mt (dn line) of Janakpuri West to R. K. Ashram Corridor (Extn of Line-8) of Phase-IV of Delhi MRTS.
7 Geotechnical Investigations for Patna Metro (DMRC-PC-01)
8 Geotechnical Investigations for Design, construction and completion of Underground stations and tunnel including Finishes form Surat Railway station To Chowk Bazar Ramp from chainage 7160.6m to chainage 10720m (Surat Metro)
9 Lucknow Metro Rail Project Package LKCC-06: Geotechnical Investigation.TATA PTOJECTS LIMITED
10 Chennai Metro Rail Project Phase-1-Extension from Washermenpet to Wimco Nagar by the CHENNAI METRO RAIL LIMITED: Geotechnical Investigation.SYSTRA
11 Geotechnical Investigation and testing for Pune metro Phase-II.Systra MVA Consulting (India) Private Limited
12 Geotechnical Investigation and testing for DMRC Package CC-04.CEC International Corporation (India) private Limited
13 Geotechnical Investigation for Bridge over Yamuna in down stream of Existing kalindi Kunj bridge, Noida (DMRC Package CC-08).S P Singla Constructions Pvt. Ltd.
14 Geotechnical Investigation for DMRC, Package-CC-12, JMC PROJECTS (INDIA) LIMITED
15 Geotechnical Investigation for DMRC package CC: 26R. ITD - ITD CEM Joint Venture
16 Geotechnical Investigation for DMRC package CC: 32. ITD - ITD CEM Joint Venture
17 DMRC Package CC-19R: Geotechnical Investigation. S P Singla Constructions Pvt. Ltd.
18 Geo technical Investigation Work: DMRC Package CC-29. AFCONS INFRASTRUCTURE LIMITED
19 Geo technical Investigation Work: DMRC Package CC-15. AFCONS INFRASTRUCTURE LIMITED
20 Geo technical Investigation Work: DMRC Package CC-43. CORSAN CORVIAM CONSTRUCTION SA AND SADBHAV ENGINEERING LIMITED JV
21 Geo technical Investigation Work: DMRC Package CC-47. CORSAN CORVIAM CONSTRUCTION SA AND SADBHAV ENGINEERING LIMITED JV
22 DMRC Package CC-82: Geotechnical Investigation. S P Singla Constructions Pvt. Ltd.
23 DMRC Package CC-87: Geotechnical Investigation. TATA PTOJECTS LIMITED
24 Geotechnical Investigation for "Contract CC-127: Design & construction of twin Box tunnel by Cut & Cover method and one underground station namely ECC centre including Architectural Finishing, Water Supply, Sanitary Installation & Drainage Works from Chainage 22902.474 to 24781.029 for extension of airport Express line from Dwarika sec-21 to ECC centre at Dwarika sec-25. AFCONS Infrastructure Limited
25 Geotechnical Investigation for CONTRACT NC-01: "Part Design and Construction of elevated viaduct and 8 elevated stations viz. Sector 71, Sector 50, Sector 78, Sector 101, Sector 81, Dadari Road, Sector 83, sector 137, including Architectural Finishing works of stations from Chainage (-) 450 m to 9038 m of Noida-Greater Noida Metro Project
26 Geotechnical Investigation from Connought place to Dilshad Garden, Delhi for Delhi Metro Railway Corpn. Project. For M/s. RITES Ltd.
27 Geotechnical Investigation & Instrumentation for Delhi Metro Rail Project - MC1A. Kumagai - Skanska - HCC - Itochu JV
28 Geotechnical Investigation for Delhi Metro rail Project, Phase - II for DPR, From University to Transport Nagar. RITES LTD. GURGAON
29 Geotechnical Investigation for Najafgarh Depo. DMRC Ltd.
30 Geotechnical Investigation for Delhi Metro rail Project, Phase - II, for DPR, From Central Secretrate to Vasnt Kunj. RITES LTD. GURGAON
31 Geotechnical Investigation for DMRC, Inderlok to Bahdurgarh corridor & stations. DMRC LTD.
32 Geotechnical Investigation for Bandra - Mankhurd Section Metro Rail project. RITES LTD
33 Geotechnical Investigation for Chennai Metro. RITES LTD
34 Geotechnical Investigation for DMRC Project (BC-21 Section). ITD - ITD CEM "JV"
35 Geotechnical Investigation for DMRC Project (BC-16 Section) for Underground Corridor. M/s CONTINENTAL ENGINEERING COMPANY, TAIWAN
36 Geotechnical Investigation for DMRC Project (BC-16 Section) for Stations. M/s SOMA ENTERPRISES LTD.
37 Geotechnical Investigation for DMRC Project (BC-24 Under ground Section). ITD - ITD CEM "JV"
38 Geotechnical Investigation for DMRC Project (AMEL C-1 Under ground Section). ALPINE - HCC - SAMSUNG JV
39 Geotechnical Investigation for DMRC Project (AMEL C-4 Under ground Section). SENBO ENGINEERING LTD.
40 Geotechnical Investigation for AMEL C-6 Contract, DMRC Project. ALPINE - HCC - SAMSUNG JV
41 Geotechnical Investigation for DMRC Project (AMEL C-1 Under ground Section) - New order. ALPINE - HCC - SAMSUNG JV
42 Geotechnical Investigation for DMRC Project (BC-24 Under ground Section) - New order. ITD - ITD CEM JV
43 Geotechnical Investigation for Tunnel by Shield TBM and Janpath and Mandi House Stations by Cut and Cover method between Centrat Secretariat and mandi House for Underground works under Delhi MRTS. PRATIBHA - CRFG JV Project. DMRC Package BC-45
44 Geotechnical Investigation for two sections of DMRC, i.e Section -I From Central Secretariat to Rangapuri and Section III : Vishwavidalaya to Transport Nagar.
45 Geotechnical Investigation for Chennai Metro.

Water Supply, Treatment & Sewerage Treatment Projects
1 Soil Investigation in Package 3 (Central) Area of the JICA Assisted Delhi Water Supply Improvement Project.
2 Improvement & Revamping of Exiting Water Supply, Transmission and Distribution Network under the command area of Nangloi Water Treatment Plant, Delhi
3 Geotechnical Investigation for the IOCL Pipe line and GAIL pipe line crossings in Slice 102 Tundla Deour.
4 & Bridge No. BR-40, S 101 GAIL Pahpund and 4 Locations.
5 Geotechnical Investigation work for Package 10 (Barahiya, Jamalpur, Jamui, Lakhisarai, Munger&Shaikhpura) Towns in Bihar
6 Geotechnical Investigation for Package 7 (Ara, Bhabhua, Buxar, Dehri, Dumraon and Sasaram) Towns in Bihar.
7 Water Treatment Plant at KM-4 site for Chambal Sawaimadhopur - Nadauti water supply Project under PHED Govt of Rajasthan
8 Soil Investigation for Water Supply Scheme for Nangloi Project
9 Geotechnical Investigation for Construction of ak-viaduct for high level feeder Canal Sifting from Km. 6.300 to Km. 7.497.
10 Soil Investigation for Replacement of Water Mains in Delhi
11 Geotechnical Investigation work for 53.5 MGD Sewage Pumping Station, Rising Main & Other related associated / allied Appurtenant on Design, Build and Operation Basis at PreetVihar, New Delhi.
12 Geotechnical Investigation work for JalVihar DJB Project
13 Providing & Laying Twin Raw Water M.S. Gravity Main, from Haderpur to Wazirabad I/C ancillary work enroute. (On Design & Build basis) Pkg II (Ch. 6.0 Km to terminating point inside Wazirabad WTP)
14 Construction of 25 MGD effluent pumping station at Rithala STP including P/L/J twin transmission mains for carrying 33.34 MGD treated effluent from EPS at Rithala to PPCL plant at Bawana on design, build and operate (DBO) basis, Delhi.
15 Geotechnical Investigation at Wazirabad WTP and Pipeline, Delhi.
16 Construction of 25 MGD Effluent Pumping station at Rithala ATP including P/L/J TWIN transmission mains for carrying 33.34 MGD treated effluent from EPS at Rithala to PPCL plant at Bawana, on design, build and operate (DBO) basis, delhi.
17 Carrying out soil investigation work for Design, construction - supply, laying & jointing, testing & commissioning of MS clear water mains from the 50 MGD WTP at Dwarka to various areas of Dwarka, Najafgarh, Daulatpur, Ujwa & IGI Airport.
18 Geotechnical Investigation Construction of 25 MGD Effluent Pumping station at Rithala, STP including P/L/J, twin transmission mains for carrying 33.34 MGD.
19 Geotechnical Investigation Work for "Design-Build-Operate 20 MGD WTP at Okhla& RWP Station at Wazirabad including Ancillary works", Delhi.
20 Geotechnical Investigation for Okhla site for Timarpur-Okhla MSW Project
21 GI for eight towns of Haryana (JBIC Aided YAP II Project) for Preparation of Sewerage Master Plan.
22 Geotechnical Investigation for Twin Raw Water MS Gravity Main, from Haiderpur to Wazirabad I/C Ancillary works WN-ROUTE for Package-I, Wazirabad WTP.
23 Soil Investigation for 50 MLD Sewage Treatment of HUDA Plant at Sohna Road, Gurgaon
24 Geotechnical Investigation for Ghazipur site for Ghazipur MSW Project.
25 Geotechnical Investigation for Kachchh Brach Canal pumping scheme in Gujrat.
26 Drilling at pumping station of SSNNL project
27 Geotechnical Investigation for Chambal SawaimadhopurNadauti Water Supply Project
28 Geotechnical Investigation for 35 MLD CEPT, Bawana Project
29 Geotechnical Investigation for 90 MGD Effluent Pumping Station I/C rising mains and other related associated / allied appurtenant works on Design, Build & Operate Basis at Yamuna Vihar, Delhi

Industrial, Building & Other Projects
1 Dynamic Stability for Left and Right bank rock slopes and Pull Out Test on Test Rock Anchors / Installation of working rock anchors and their pull out testing in connection of proposed 122m Span Suspension Bridge over river Dhauliganga, Kanchoti, Uttrakhand
2 Geotechnical Investigation works as per approved specifications at Dairy Plant site located at Village- BenolaBilaspur, Near KMP Highway, Manesar, Haryana.
3 Geotechnical Investigation for Statue of Unity Project at Kevadia, Gujarat including other structures (Main Statue, Bridges, Visiting Center & Hotels).
4 Geotechnical Investigation works for Multi Modal Transport Hub at Boraki in Greater Noida.
5 Soil Investigation by Bore Holes Samples Work for the Design & Construction for New Factory P/J of M/s. Honda Cars India ltd. Plot No. A-1, Sector - 40/41, Surajpur - Kasna Road, Greater Noida Industrial Area, Dist. GautamBudh Nagar, U.P. (India).
6 Geotechnical Investigation works including drilling of Seven exploratory boreholes for Dunnu Resorts, Chail in Himachal Pradesh
7 Geotechnical Investigation for Consultancy service for detailed engineering and Project Management for Upgradation& expansion of facilities at ICD Babarpur, Panipat (Haryana) and ICS PhapperDistt. Mohali, (Punjab)
8 Geotechnical Investigation for the Maruti Proving Ground project at Rohtak in Haryana
9 Soil Investigation for Industrial Project at Dharuhera.
10 Soil Investigation for construction of Factory P/J for M/s Futaba &Maruti New JV at Plot No. 1/4,5,8 & 9 Phase-3A, IMT Manesar, Haryana
11 Soil Investigation for M/s. YMIPL at Plot No. A-3, Industrial Area, Noida-Dadri Road, Surajpur, Distt. G.B. Nagar (U.P)
12 Soil Investigation for Proposed development on Plt No. 07, Tech Zone Greater Noida.
13 Geotechnical Investigation for Structures at Pathredi Industrial Park.
14 Geotechnical Investigation for wheel plant at Chhapara, Bihar
15 Soil Investigation for Construction of Mitsuba's New India Factory Project at Bilaspur-Taoru Road, Haryana
16 Geotechnical Investigation for carrying out Drilling work, testing of sample and submission of report etc. for Bridges for 2 x 500 MW Anpara'D' TPP Phase-I works of M/s UPRVUNL (2)
17 Soil Investigation for M/s. YMIPL at Plot No. - A-3, Industrial Area, Noida-Dadri Road, Surajpur, Distt. G.B. Nagar (U.P)
18 Soil investigation and resistivity test at 220/33KV substation at Masjid Moth in Delhi.
19 Geological & Geotechnical sub-surface investigations for locating two additional PHWR units (KAPP 3 & 4) at KAKRAPAR, Gujarat State.
20 PLT and Area Survey for Hydrogen and Hydrotreater plant at IOCL, Guwahati
21 Soil Investigation work for 1x125 MW Giral Lignite Power Project against TN-1102.
21 Geotechnical Investigation work including drilling for Dunnu Resorts, Shail in Himachal Pradesh.
22 Geotechnical Investigation work for Development of an ICD near Modinagar (UP) for Kribhco Infrastructure Ltd.
23 Work Order for Piling for Shoring works for the Bus Terminal Cum Commercial Complex at Mohali, Punjab
24 Geotechnical Investigation for proposed construction of buildings (Ground +3/4 structure) for IGNOU Campus at Delhi.
25 Soil Investigation work at ISBT, Kashmere Gate, Delhi
26 Soil Investigation for Andhra Pradesh Bhawan Site at New Delhi
27 Geotechnical Investigation for Hotel cum Convention Center at Dehradun
28 Geotechnical Investigation for Propsed NBCC Depot Site
29 Sub-Soil Investigation for Construction of New Terminal Building at Leh Civil Enclave Under Airport Authority of India.
30 Geotechnical Investigation for Ginger Hotel - Pantnagar.
31 Geotechnical Investigation for IT Bilding at Gurgaon.
32 Geotechnical Investigation for proposed building (with single basement) at Plot No.65, Sectior-32, Gurgaon.
33 Geotechnical Investigation for Construction of GataamBudha University, Gr. Noida
34 Geotechnical Investigation for the proposed Hospital of Dr. Negi at Section 21, Faridabad

Geophysical Surveys / Ground Water Surveys
1 Static Refraction Survey in Thane Creek portion of 21 km. long tunnel of Mumbai-Ahamedabad High Speed rail corridor Project.
2 Seismic Refraction Test for Construction Operation and maintenance of 2 Lane By Directional Zojila Tunnel with parallel Escape Tunnel km 95.00 to 118.00 in Jammu &kashmir
3 Conducting Seismic Refraction Test of Tunnel for Development of Kathmandu - Nijgadh - PathlaiyaTerai / Madhes Expressway Project through PPP on BOT Basis in Nepal.
4 Conducting Seismic Refraction Survey Test of Z-MORH Tunnel in the State of J & K
5 Conducting Seismic Refraction Survey for Tunnels T1 and T4 of Kiratpur - NerChowk Section of NH-21 in State of Himachal Pradesh
6 Geophysical investigation by seismic Refraction survey and studies for selection of dam alignment for preparation of PFR for Baghdara Hydro Power Project in Afghanistan
7 Geophysical surveySeismic Refraction survey at tunnel portals_Preparation of suitable Alignment Plans of the Tunnel from Km. 244 to Km. 140 (Harangajao - Maibong) section of NH- 54 in the state of Assam
8 Seismic Refraction and 2D Resistivity Imaging Survey(Slope and Tunnels)for proposed Ramban to Banihal Section of NH-1A (Km 151 to 187) in the state of J&K under NHDP Phase-II
9 Seismic refraction survey for proposed Chennai METRO rail project Phase-1,
10 Detailed investigations using seismic refraction survey and resistivity imaging in borrow area at Sera, Dakoi and Bhason for excat RBM assessment for completion of KHEP & PSP in Uttrakhand.
11 Seismic Refraction and 2D resistivity Imaging at Chamba for proposed tunnel at NH 45.
12 Seismic Refraction and 2D resistivity Imaging for proposed "Four-Laning of Parwanoo-Solan Section of NH-22 from km 67+000 to km 106+000 at Solan in the State of Himachal Pradesh on EPC Mode".
13 Down hole seismic tests conducted for DMRC
14 Seismic Refraction and 2D resistivity imaging for the proposed Slurry pipeline from Kirandul to Vizag and Water pipeline from Sukma to Kirandul. ln order to asses the ground haracteristics of the subsurface at HDD and Micro tunneling of the proposed pipelines.
15 Investigation for availability of ground water by electrical resistivity method for the design & construction for M/s. Toto India Industries Pvt. Ltd., at survey no. 1540P, 1555P, 1556, 1557 & 1558/P at Halol Industrial area, Halol, Gujarat
16 Ground water investigation for proposed site for Lab at Pasteur Institute of India at Coonoor, Tamilnadu
17 Ground water investigation for capacity building projects at State Food Lab - Mumbai
18 Ground water investigation for MORARJIDESAI NATIONAL INSTITUTE OF YOGA, NEW DELHI
19 Ground Water Survey for SAFDARJUNG MEDICAL COLLEGE AT SAFDARJUNG HOSPITAL, NEW DELHI
20 SawaiMadhopur Water Supply Project for PHED, Rajasthan_Seismic Refraction Survey & Resistivity Profiling at Chambal River.
21 Electrical earth Resistivity Test at DMRC Project CC-24, CC-04, CC-32, CC-43, CC-47 etc
22 NATURE OF SUB-SOIL/ROCK BY ERT METHOD FOR TALUQAN-KISHEM ROAD PROJECT, Afghanistan
23 Earth Resistivity Tests, 2 at every UGP/PH site - 18 Locations
24 Non-Destructive Testing to determine unknown foundation depth at American center Building, Kasturba Gandhi Road, new Delhi, CC-01 DMRC Project

Pile Construction
1 Bored cast-in-situ R.C.C. Piling-Using DMC method complete as per drawing and technical specifications of MORTH Rev 5 & IRC: 78-2000.
2 300 mm Diameter Under-reamed Piles for Moriroku Factory at Noda (1997).
3 500 mm Diameter Bored Cast-in-situ Piles for Construction of Hongo Factory in Greater Noida (1998).
4 1200 mm diameter Bored Cast - in- situ Piling work for Construction of BirTekendrajeet Flyover near Maharani bridge at Imphal (2003-04).
5 Piling work at Bawal for Industrial project.
6 500 mm diameter Piling work at IOCL, Guwahati Refinery for Hrdrotreater and Hydrogen Plant (2001-02).
7 Piling at Bawana Delhi (500 mm diameter Bored Cast-in-situ Piles)
8 Installation and Load Test of 1200 mm dia Bored Cast-in-situ Piles by DMC method for the structures in KMP Expressway in Km 90.00 to Km 135.650
9 PILING AT WAZIRABAD PROJECT (600mm Diameter Bored Cast-in-situ Piles - About 1500 Nos.)
10 Piling work for construction of various structures at Package CII - BR-9 of east West Corridor, part of NH-57 near Muzaffarpur - 1200 mm diameter Bored Cast-in-situ Piles
11 1200 mm diameter Bored Cast-in-Situ Piling at Bridges for Tepla - Banur - Landran - Kharar Project
12 Bored Cast-in-situ Piles of 1200mm dia for Bridges at "Improvement &Upgradation of Araria -Bhaphiyahi Road (121 Km) , SH-76 under Bihar State Highway Project (Package-08)"
13 Bored Cast-in-situ Piles of 1200mm dia for Bridges at "Improvement &Upgradation of Kursela-Forbesganj Road (105 Km) , SH-77under Bihar State Highway Project (Package-08)"
14 Bored Cast-in-situ Piles of 500mm dia for Rail / Road Bridge at "Munger, Bihar".
15 Bored Cast-in-situ Piles of 1200mm dia for Bridges at Improvement / Upgradation of Hajipur-Lalganj-Vaishali-Manikpur-Deoria-Areraj Road (SH-74) 85 Km.under Bihar State Highway Project"
16 Bored Cast-in-situ Piles of 500mm / 800mm dia for Rail / Road Bridge at "Munger, Bihar"
17 DMC Piling at PreetVihar Delhi (400 mm diameter Bored Cast-in-situ Piles)
18 DMC Piling for shoring works for the Development of Bus Terminal cum Commercial Complex at Mohali, Punjab
19 DMC Piling for River bridge over River Hindon, Ghaziabad, UP
21 Bored Cast-in-situ Piles of 1000mm / 1200mm dia for Bridges at Etawa - Chakeri Section of NH-02

Topographical Survey
1 Topographical survey fo four lanning of Aunta - Simaria Ganga Bridge NH-31 in the State of Bihar
2 Topographic Survey of a Green Field Site at Nation Capital region
3 Topographical Survey for Joint Aviation facilities at Kabul International Airport, Afghanistan
4 Detailed Topographical Survey at NSCA site at Kabul International Airport, Kabul
5 Topographical Survey for Jalabsaraj - Surbhi Road, Afghanistan
6 Assessment of Construction Material (CA & FA) in terms of Quantity and Quality from various Quarries for Bunakha HE Project (180MW), at Bunakha, Chhukha, Bhutan - Detailed Topographical Survey for Quarries
7 Geological and Geotechnical Investigation for KAPP - 3&4, at Kakrapar, Detailed Topographical Survey
8 Topographical Survey for Bhagirthi WTP, Delhi
9 Topographical Survey work at Rajpura TPP, Punjab
10 Topographical Survey for ISRO Complex at sadiq nagar, new delhi
11 Consultancy services for Assessment of Quality and Quantity of construction material in various Quarries for Vishnugad-PipalkotiH.E.Project - Detailed Topographical Survey for Quarries
12 Detail investigation of borrow areas at Gairogi Sera, Dakoti&Bhason for exact RBM assessment for completion of KHEP & PSP. Detailed Topographical Survey for Quarries

top
Download Company Profile
To receive the company brochure, please fill out the form with an active email address. The download link will be sent to the provided email.

Projects

Some of Major Geotechnical Investigation Works Executed in India

FAQs
Frequently asked questions about geotechnical services.
What information is needed for a geotechnical investigation?
What types of projects require geotechnical services?
WHAT WE'RE THINKING
Insights
Valuable insights that empower your decision-making,
Case Studies
Inspiring examples of financial tailored solutions.
Media Mentions
Recognizing our expertise and client success.
Stay ahead in a rapidly changing world

Our monthly insights for strategic business perspectives.

Search